My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-569 <br />20 June 2006 <br />Revised 78 October 2006 <br />Page 11 <br />Table 3 <br />FOUNDATION DESIGN CRITERIA FOR <br />CAST-IN PLACE PIERS <br />Item Criteria <br />Diameter Minimum 12 in. <br />Spacing Minimum 3 pier diameters, center to <br /> center <br />Depth' Minimum of 10 feet, or 3 feet into <br /> native soil, whichever is deeper, as <br /> determined by our representative during <br /> drilling. Maximum spacing to be <br /> determined by the Project Structural <br /> Engineer. Pier depths are expected to <br /> be 10 to 15 feet in depth. <br />Allowable Friction Value2 Allowable friction value of 500 psf, <br /> which may be increased by 1 /3 for wind <br /> and seismic loads <br />Lateral Loads See Section 6.3 "Lateral Load Design <br />Criteria <br />1 . Depth of foundation embedment is measured from the lowest adjacent soil grade to the bottom of the pier hole. <br />2. The recommendations above may be increased by one-third for wind and seismic loads. <br />- Care should be taken to avoid "mushrooming" at the bottoms of the grade beam <br />or at the tops of piers when placing concrete. We recommend that concrete be <br />placed in all pier holes within 24 to 48 hours after the time of acceptance by our <br />firm's representative. <br />We recommend our representative observe pier drilling to confirm the competence <br />of the materials in the pier holes. Depending on the time of year of drilling and <br />the pier location, groundwater may be encountered in some pier holes. In such <br />cases, the pier holes should be cleaned of loose slough and either pumped dry just <br />prior to pouring concrete or tremied with concrete to "float" the water above the <br />concrete with the tremie hose maintaining a minimum 5-foot head of concrete at <br />all times during hose removal. <br />~ orbmacher Engineering. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.