Laserfiche WebLink
Project No. JB-569 <br />20 June 2006 <br />Revised 78 October 2006 <br />Page 13 <br />that the structural fill placed behind the retaining wall be granular, if possible. If <br />installing a subdrain system is not possible, the retaining walls should be designed <br />for full hydrostatic loading. We recommend that the foundation walls be <br />waterproofed. <br />The retaining wall drainage blanket should extend the full height of the wall to <br />within 12 inches of the top of backfill. The drain should consist of a minimum <br />thickness of 12 inches of drain rock surrounded by an approved non-woven <br />geotextile. Class 2 Permeable material is an acceptable equivalent for drain rock <br />and geotextile. A 4-inch perforated PVC pipe should be placed at the base of the <br />drain, bedded in a minimum of 2 inches of drain rock, the pipe should be installed <br />with the perforations facing down and sloped to drain at a minimum grade of 1 <br />percent. Outside of the drainage system, the drain should be extended with solid <br />~ ~ pipe to an acceptable discharge point. <br />6.5 Concrete Slabs-on-Grade <br />We anticipate araised-wood floor will be used with a drilled pier and grade <br />foundation system. However, if the earthwork recommendations are complied <br />with, concrete slabs-on-grade may be protected from unwanted moisture vapor <br />by an underlainment of a 4-inch thick capillary break of Class 2 drain rock, clean <br />by 3/4-inch crushed drain rock, or pea gravel. Class 2 base rock may not be <br />used as the capillary break. If the potential for a damp slab is undesirable or if <br />moisture sensitive floor coverings are used, we recommend that a membrane of <br />10-mil minimum thickness be placed on the drain rock and overlain by a minimum <br />of 2 inches of clean sand to assist in the proper curing of the slab. The select <br />material or sand should be moistened but not saturated prior to placement of <br />concrete. <br />It should be noted that the intention of the membrane is to limit moisture <br />transmission through the slab, not to eliminate moisture transmission through the <br />slab. A membrane will not eliminate moisture transmission which can cause mold <br />growth. The membrane must be constructed properly to effectively limit moisture <br />transmission. Proper construction includes sealing the perimeter of the membrane <br />as well as all seams and penetrations. <br />If greater resistance to moisture transmission is desired, we recommend sealing <br />the slab with an approved concrete sealant. We also recommend reducing the <br />water-cement ratio of the concrete mix design for slabs as low as possible to help <br />further reduce the potential for moisture passing through the slab. The structural <br />engineer should determine the final requirements of the concrete mix design. <br />K.orbmacher Engineering, Inc. <br />.~ <br />