My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Green Building Ordinance. However, a condition of approval encourages that all of the <br />buildings meet the Green Building Ordinance. <br />The green building measures for these buildings shall be shown on the building permit plan set <br />submitted for review and approval for review by the Planning Director before issuance of a <br />building permit. <br />Grading/Urban Stormwater Runoff <br />'This is a flat site, slightly elevated above the street grade at the corner of Stanley Boulevard and <br />Bernal Avenue. Grading for the development will include mobilization, clearing and grubbing, <br />site grading, and trenching for on-site infrastructure leading to the construction of the building <br />and site improvements. The entire site would be graded at once. Short-term impacts are ex- <br />pected related to these activities. All construction equipment is required to conform to current <br />exhaust standards for emission reductions to maintain compliance to NOr standards. "fo miti- <br />gate short-term construction impacts, the applicant is required to provide the following dust con- <br />trol measures to reduce dust emissions. <br />^ Enclose, cover or water all soil piles minimally twice daily, or as otherwise determined <br />by the City Engineer. <br />^ Minimally water the site twice daily, or as otherwise directed by the Public Works In- <br />spection Staff. <br />Urban Storm water Runoff <br />Bio-swales/retention areas would be located in the parking areas and in the perimeter landscape <br />areas facing Stanley Boulevard and Bernal Avenue. The recently completed U. S. Petroleum <br />service station is an example of a retail use with perimeter bio-swales. Parking areas bio-swales <br />would be augmented with pervious paving. <br />The overall site development constitutes approximately 591,317 square feet of build- <br />ing/hardscape areas, including on-site sidewalks and plaza areas, which will alter the site's <br />drainage patterns from its existing condition vacant land. The proposal is subject to the Na- <br />tional Pollutant Discharge Elimination System (NPDES) of the Clean Water Act to regulate <br />storm water discharges from construction activities and the general quality of storm water in the <br />City's storm water systems. The applicant will conform to the NPDES program with the fol- <br />lowing requirements: <br />^ The landscape areas facing Stanley Boulevard, Bernal Avenue, and Nevada Court would <br />be designed and graded to function as bio-swales. The paved areas are graded to drain <br />towards the bio-swales and then to catch basins within the swales before entering the <br />City's storm drain system. <br />^ The project developer would be required through the building permit and construction <br />process to incorporate best management practices for discharges resulting from this de- <br />PCUP-165/PDR-529/PMOD-81-25-7M Page d0 of 36 December 13, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.