My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT I <br />PDR-529 and PUD-81-25-7M ReQencv Centers (Don MacKenzie and Pete Knoedler) <br />Work session to review and receive comment on an application for a PUD major modification <br />and design review approval to allow the construction of a Home Depot store and garden center, <br />three multi-tenant retail buildings, one drive-through restaurant/retail building, and a Long's <br />Drugs with one drive-through lane, totaling approximately 193,481 square feet in floor area, on <br />a vacant 14.7-acre site located on the southeast corner of Stanle}~ Boulevard and Bernal Avenue <br />in the Stanley Business Pai°k. Zoning for the property is PUD-C (Planned Unit Development - <br />Commercial) District. <br />Mr. Pavan presented the project, which included revisions based on the input and direction provided <br />by flee Commission at the project's January 2006 work session. He demonstrated flee revisions <br />through a PowerPoint presentation, comparing the new design with the old and showing the <br />redesigned building architecture, the Long's Drugs that replaced the gas station and includes a <br />pharmacy drive-through that is screened from Stanley Boulevard, the addition of a covered arcade <br />along the frontage, enhanced entryways, and roof areas. He noted that the loop road along the back <br />of the property has been eliminated. He then pointed out the other proposed stores and building pads <br />and how they complemented the Home Depot building design. He called the Commissioners' <br />attention to the detailing of the corner element to get their direction on whether eaves should be <br />installed to match the rest of the building. He indicated that the design had been forwarded to <br />Mr. Larry Cannon, the City's architectural peer review consultant, who found the design to be <br />generally very good, with the exception that additional detailing needed to be worked out. <br />Mr. Pavan stated that traffic is an issue, and the applicant proposes to address the project's traffic <br />generation and traffic situation at the intersection by adding lanes along Bernal Avenue and Stanley <br />Boulevard. He advised that the traffic report is currently being prepared and would be presented at <br />the public hearing for the project. He added that noise impacts would likewise be addressed at that <br />hearing. <br />Conunissioner Fox noted that the Commission had directed moving the Home Depot building <br />100 feet farther north away from Nevada Court, thereby creating a b ~een belt between the Center and <br />Congregation Beth Emek. She inquired if the building was moved and flee greenbelt created in <br />response to this directive. Mr. Pavan replied that the building has not been moved and advised that <br />die revised site plan was reviewed by representatives from the synagogue, who indicated that the <br />proposed plan was acceptable to them. He pointed out that the area where the truck turnaround is <br />located has been completely landscaped to screen the corner of the project from view fi-om the <br />synagogue. <br />Commissioner Fox stated that at the last workshop, the Commission discussed that most big box <br />stores are located close to the freeway as opposed to this proposed project, which would be located <br />approximately three miles from the I-580/Santa Rita Road ramp. She inquired if staff or the applicant <br />has identified another Home Depot store that is as far from the freeway as this one. Mr. Pavan <br />deferred the question to the I Ion1e Depot architect who was in attendance. <br />Commissioner Blank indicated that he was not present for the first workshop and inquired if flzere <br />were reasons why deliveries on Saturday morning were a concern but Friday evenings were not, <br />considering that the synagogue conducted services both on Friday evening and Saturday mornings. <br />EXCERPT: PLANNING COMMISSION MEETING MINUTES, May 24, 2006 Page 1 of 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.