Laserfiche WebLink
PUD-6~ Environmental Checklist <br />Less 'Than <br />Potentially Significant Less Than <br />Signitcant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Transportation and Traffic <br />Would the project: <br />a) Cause an increase in traffic which is substantial in ~ ~ ~X <br />relation to the existing traffic load and capacity <br />of the street system (i.e., result in a substantial <br />increase in either the number of vehicle trips, the <br />volume to capacity ratio on roads, or congestion <br />at intersections)? <br />b) Exceed, either individually or cumulatively, a ~ ~ ~ ^X <br />level of service standard established by the <br />county congestion management agency for <br />designated roads or highways? <br />c) Result in a change in air traffic patterns, including ~ ~ ~ ~X <br />either an increase in traffic levels or a change in <br />location that results in substantial safety risks? <br />d) Substantially increase hazards due to a design <br />feature (e.g., sharp curves or dangerous <br />intersections) or incompatible uses (e.g., farm <br />equipment)? <br />e) Result in inadequate emergency access? ~ ~ ~ ^X <br /> <br />f) Result in inadequate parking capacity? ~ ~ ~X <br />g) Conflict with adopted policies, plans, or programs ~ ~ ~ ~X <br />supporting alternative transportation (e.g., bus <br />turnouts, bicycle racks)? <br />Discussion <br />a, b) The proposed 21,795-square-foot office building would generate 34 AM Peak Hour trips <br />and 32 PM Peak Hour trips based on the trip generation rates for such a use in the City's <br />2003 Baseline Traffic Report. However, office traffic for the 5980 Sunol Boulevard <br />parcel was included in the traffic analysis and mitigations for the North Sycamore <br />Specific Plan (NSSP) and Environmental Impact Report (EIR). The NSSP EIR assumed <br />13,378 square feet (30% FAR) of office use traffic from this site. The 13,378 square feet <br />of office use would have generated 21 AM Peak Hour trips and 20 PM Peak Hour trips. <br />Reducing these already planned and mitigated trips from the trips of the proposed project <br />30 <br />