Laserfiche WebLink
20.52.050 <br />and based on the structural stability of <br />the structural engineering report. To en- <br />sure that the work progresses in a time- <br />ly manner, the property owner shall <br />obtain a building permit at least one <br />year prior to the last day of the time <br />frame established by table B of this <br />section. <br />Table A -Rating Classification <br />Type Of Building Classification <br />Hazardous building I <br />High risk building II <br />Medium risk building III <br />Low risk building IV <br />Table B -Time Frame Based On Type <br />Classification Type Time Frame <br />I Hazardous or dangerous Immediately <br />II High risk 5 years <br />III Medium risk 7 years <br />IV Low risk 10 years <br />2. If the building owner desires not <br />to reinforce the building, the city's <br />existing process for staff and city <br />council review of a demolition permit <br />shall apply. Each building shall be <br />reviewed independently to determine its <br />contribution to the downtown. All de- <br />molition permits for buildings down- <br />town shall be reviewed by the city <br />council to ensure that all alternatives <br />have been explored. <br />C. Step 3: <br />If a property owner does not begin <br />nor complete the required reinforcement <br />within the applicable time frame, the <br />building official shall have the authori- <br />ty to prohibit the occupancy of the <br />building until the repairs have been <br />completed. (Ord. 1869 § 14, 2002; Ord. <br />1563 § 1, 1992) <br />20.52.060 Scope: <br />A. General: The provisions of this <br />chapter, subject to the limitations of <br />subsections B and C of this section, <br />shall apply to existing buildings having <br />at least one unreinforced masonry bear- <br />734-3 (Pleasanton April 2003) <br />