Laserfiche WebLink
20.24.120 <br />to an approved central station, to <br />provide an immediate response to <br />an alarm. The alarm shall be both <br />visual and audible and shall be <br />designed to provide warning both <br />inside and outside of the storage, <br />use or handling area. The audible <br />alarm shall be distinct from all <br />other on-site alarms. <br />(6) Reduced Flow Valves. Re- <br />duced flow valves may be utilized <br />to reduce the maximum flow rate <br />from cylinders and tanks under <br />full flow conditions. Valve flow <br />rates may be considered in deter- <br />mining the size of treatment sys- <br />tems required for a worst case <br />release. <br />(7) Seismic Shut-off Valves. A <br />__ seismologically activated valve <br />meeting standards approved by the <br />Fire Chief shall be provided for <br />automatic shut off of regulated <br />materials upon a seismic event <br />within 5 seconds of horizontal <br />semisoidal oscillation having a <br />peak acceleration of .15g <br />(=1.47m/sec2) and a period of .4 <br />seconds. <br />(8) Class II Corrosives. Inert <br />construction materials shall be <br />used for the primary containment <br />of Class II Regulated Materials <br />which are corrosives. Alternative- <br />ly, secondary containment shall be <br />provided for Class II materials <br />which are corrosives. <br />(9) Emergency Alarms. When <br />materials regulated by this Article <br />are transported through exit corri- <br />dors or exit enclosures, there shall <br />be an emergency telephone system <br />or a local manual alarm station or <br />a signaling device approved by the <br />Fire Chief at not more than <br />150-foot intervals and at each exit <br />doorway throughout the transport <br />route. The signal shall be relayed <br />to an approved central station and <br />shall also initiate a local audible <br />alarm. <br />(d) Class III Controls. Persons <br />responsible for a facility shall cause <br />materials which are classified as <br />Class III materials to be provided <br />with the controls specified in this <br />subsection (d) and in subsections (e) <br />and (f) of this section. <br />(1) Piping, valves and fittings. <br />[i] Piping, valves, fittings <br />and related components shall be <br />designed and fabricated from <br />materials compatible with the <br />material to be contained. They <br />shall have strength and durabili- <br />ty sufficient to withstand the <br />pressure, structural and seismic, <br />and any other stress and expo- <br />sure to which they may be sub- <br />jected. <br />[ii] Expansion chambers <br />may be provided between valves <br />whenever the regulated gas may <br />be subjected to thermal expan- <br />710-25 (Pleasanton 5-99) <br />