Laserfiche WebLink
THE ASSESSMENT DISTRICT <br /> <br />Description of the Project <br /> <br /> The City has conducted assessment district roceedings to provide for the acquisition <br />of certain public improvements for the benefit of F2nd wit in the Assessment District. The <br /> h <br /> ublic improvements the acquisition of which is to be financed through the. Assessmen~ <br />F~istrict proceedings include a new street called Koll Center Parkway, and a new street called <br />Koll Center Drive; the improvement of the south side of the Arroyo del Valle from Valley <br />Avenue to Interstate Highway 680; the improvement of an area along the east side of the <br />Interstate Highway 680; the ~nstallation of a system of utility improvements adjacent to Koll <br />Center Parkway and Koll Center Drive; and the constructran of a sewer s stem, subdrain <br />system and storm drainage system, together with all work auxiliary to any o~ the above and <br />necessary to complete the same. <br /> <br />Location and Terrain <br /> <br /> The City is located a proximately 40 miles southeast of San Francisco in the south- <br />eastern portion of Alameda ~ounty. The Assessment District is located adjacent to Interstate <br />Highway 680 at Bernal Avenue. It is therefore located within one hour driving time of t. he <br />San Francisco and Oakland International Airports and within one hour of all major <br />metropolitan centers of the San Francisco Bay Area, including San Francisco, Oakland, San <br />Jose, Walnut Creek, San Mateo, Palo Alto and Berkeley. The Assessment District consists of <br />approximately 87.931 net acres of generally level land. <br /> <br />Land Use and Zoning <br /> <br /> The property within the Assessment District is zoned to permit the development of <br />industrial, commercial and office buildings. <br /> <br />joint v and Patrician Associates, Inc. <br /> <br /> The Develo er has received Planned Unit Development CPUD" zoning approval <br />rom the City for tee development of the property. The PUD provides ~or the design and <br />fayout of the project specifyin the maximum density, height, floor area ratio and specifying <br />the landscaping and on- and o~-site improvements. <br /> The City and Developer have entered into a Development Agreement vesting until <br />October 1, 1988 the Developers right to develop the property as specified in the PUD. The <br />City retains discretionary approval over design of the remaining undevelo ed buildings and <br />sites; additoinal mitigation measures for traffic and matters of healtE and safety; of <br />conditionally allowed uses specified in the PUD; and construction. The City has a reed, in <br />the Development A reement, to exercise its discretion in a manner that will not interfere with <br />the develo ment o~the pro erty as approved by the PUD and will not make the project <br />economicaFly infeasible or arbitrarily increase the cost of development. <br /> Other 'urisdictions have ap roval authority for various aspects of s ecific uses (e.g. <br />County healtl~ department over ~od service) and are not limited by t~ee Development <br />Agreement. <br /> <br />Additional Traffic and Recreation Mitigation Measures <br />significant road improvements necessary for the development of r City traffic <br /> <br /> <br />