Laserfiche WebLink
Project Costs <br /> <br /> The following table sets forth the Assessment Engineer's confirmed costs of the <br /> Project: <br /> <br /> CITY OF PLEASANTON <br /> ASSESSMENT DISTRICT NO. 1987-1, KOI J. CENTER PLEASANTON <br /> ENGINEER'S CONFIRMED COSTS <br /> <br />A. STREET IMPROVEMEN'I~ $ 735,100 <br /> <br /> 1. Clearing and grubbing, grading <br /> <br /> pavement, base, street signing and <br /> marking, erosion control and <br /> survey monuments $500,500 <br /> 2. Curb and gutter, median curbing, <br /> driveway approaches storm drain <br /> outfill & curb drain inlets 138,600 <br /> 3. Street light system 96,000 <br /> <br />B. UTILITY IMPROVEMENTS $1,463,090 <br /> <br /> 1. Storm drain system $405,700 <br /> 2. Sanitary sewer system 204,800 <br /> 3. Water system and hydrants 346,800 <br /> 4. Subdrain systems 50,000 <br /> 5. Trenching and backfill for power, <br /> gas, and telephone conduits and <br /> structures, and installation <br /> of facilities 455,790 <br /> <br />C. PUBLIC AREA LANDSCAPING $1,678,500 <br /> <br /> 1. Landscaping and irrigation at <br /> roadway sidings and median <br /> areas including sidewalks and <br /> entry walls $933,800 <br /> 2. Landscaping and irrigation at <br /> Arroyo area includin roadways, <br /> walkways, parcourse i~rniture <br /> and drainage system 361,000 <br /> 3. Landscaping and irrigation <br /> at west perimeter area <br /> including pat. hways and <br /> monument s~gn 235,200 <br /> 4. Landscaping and irrigation <br /> within Caltrans right-of-way 148,500 <br /> <br /> <br />