Laserfiche WebLink
D. ARROYO IMPROVEMENTS $23 1,500 <br /> <br /> 1. Bank stabilization $182,600 <br /> 2. Revegitation 48,900 <br /> <br />E. ASSOCIATED GENERAL COSTS $1,101,810 <br /> <br /> 1. Construction Management (10% <br /> of $3,901,085) $436,700 <br /> 2. Const. staking and civil eng. 178,900 <br /> 3. Soils engineering and <br /> field observation 38,500 <br /> 4. Landscape architectural <br /> fees 190,810 <br /> 5. Architectural consultants 10,300 <br /> 6. Traffic en ineering 5,100 <br /> 7. Planning ~onsultant <br /> 7,000 <br /> 8. City plan check &inspection 132,300 <br /> 9. Attorneys fees <br /> (main agreements) 10,200 <br /> 10. Encroachment permits 700 <br /> 11. Grading permit 400 <br /> 12. Irrigation meter fees 53,900 <br /> 13. Labor & materials & <br /> faithful performance bonds 37,000 <br /> <br />ASSESSMENT DISTRICT COSTS $184,000 <br /> <br /> Assessment District administration 75,000 <br /> Bond Counsel fees and costs 77,000 <br /> Bond tinting 5,000 <br /> Publisging and miscellaneous 2,000 <br /> Appraisals 10,000 <br /> Preparation of engineer's report 15,000 <br /> <br />Allowance for capitalized interest (7 months @ 8.5%) $310,000 <br />Allowance for reserve fund (5% of Issue) $310,000 <br />Allowance for bond discount (3% of Issue) $ 186,000 <br /> <br /> TOTAL AMOUNT ASSESSED ~ <br /> <br /> <br />