Laserfiche WebLink
• • <br />1 <br />2 <br />3 <br />5 <br />6 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />1~+ <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />2~ <br />25 <br />f r ....., A ..~ .-, <br />may, at its sole discretion in writing, authorize a greater amou~it <br />(8) To maintain, at STATE's expense, the entire <br />overcrossing structure below the top of the concrete deck surfa~.,'® <br />exclusive of any surface treatment thereon and above the concret.;~ <br />eck surface, to maintain the chain link railing. <br />SECTION II <br />CITY AGREES: <br />(1) To bear the cost of the additional rights of`. <br />way required for PROJECT; to bear the costs not normally borne <br />by utility owners of all utility protection, relocation or <br />removal; and to bear that portion of the construction costs not <br />borne by FAI, FAU or STATE funds. <br />(2) To deposit with STATE, within 14 days of <br />receipt of billing therefor (which billing will be forwarded upc:~z <br />execution of this Agreement by STATE), the amount of $56,000, <br />which figure represents the total estimated cost of rights of w~;:~ <br />to be acquired by STATE on behalf of CITY pursuant to this <br />Agreement less the FAU funds participation for right of way costs. <br />CITY will be billed separately for CITY's share of utility <br />protection, relocation or removal costs, if any. <br />(3) To deposit with STATE, within 25 days of <br />receipt of billing therefor (which billing will be forwarded <br />immediately following STATE's bid advertising date of a <br />construction contract for PROJECT), the amount of money which when <br />-4- <br />