Laserfiche WebLink
~~' + ~ ~ ~' <br />04-Ala-680 A18.3/f118.4 <br />04215 - 288011 <br />Dist. Agent. #4-0793-C <br />Construction Cost Breakdown <br />Total Estimated Construction Cost of <br />PROJECT (including contingencies) <br />EXHIBIT B <br />_ X2,500,000 <br />Federal-Aid Interstate Participation (about 26 2/3%) <br />_ (2,500,000) x (0.2667) <br />_ ~ 667,000 <br />STATE and CITY contribution = X1,833,000 <br />Federal-Aid Interstate Participation = ~ 667,000 <br />STATE' share = (1,833,000) x (0.455)= approximately 833,000 <br />'~CITY's share = (1,833,000) x (0.545)= approximately 1,000,000 <br />Total Estimated Construction Cost = X2,500,000 <br />*CITY may use FAU funds for a portion or all of its share. <br />STATE will bear the costs of Preliminary Engineering, <br />Construction Engineering and Flight of Way Services. <br />CITY will bear the costs of the additional Flights of Way and <br />the costs not borne by utility owners of utility protection, <br />relocation or removal. <br />