Laserfiche WebLink
- .~ <br />Steven R. Bocian <br />Subject: Modifications and Additions to Construction Documents <br />200 Old Bernal <br />Pleasanton, California <br />ATI Proposal No.: 98-441- Revision 1 <br />Page - 2 - <br />3. Mechanical, electrical, plumbing - $ 5,500 <br />4. Interior finish selections - $ 3,000 <br />5. Construction Administration $16,400 <br />(From City Reference # 958073) <br />6. In addition to the above not to exceed fees, we are <br />to be reimbursed for our direct costs outlined in our <br />attached Standard Terms and Conditions. <br />3.0 WORK BEYOND SCOPE OF SERVICES <br />1. Topo maps and surveys <br />2. Soil reports <br />3. As-built drawings <br />4. Fees to City <br />5. Cost estimates <br />4.0 ACCEPTANCE <br />Your signature in the space provided will serve as authorization to proceed with the work <br />described herein. This proposal will expire if not signed and returned to us within 30 <br />calendar days. <br />We appreciate the opportunity to provide you with this proposal. We look forward to working with <br />you on this project. <br />AUTHORIZATION TO PROCEED <br />TITLE <br />DATE <br />Attachment: Standard Terms and Conditions <br />Vice President, Architectural Division <br />