My WebLink
|
Help
|
About
|
Sign Out
CROCKER PROPERTIES
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
C
>
CROCKER PROPERTIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 4:45:52 PM
Creation date
10/18/2007 2:10:45 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/20/1990
LONG TERM AGREEMENTS - NAME
CROCKER PROPERTIES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • <br />optional right-turn and left-turn lane <br />at this "T" intersection. This will <br />spread the critical southbound left turn <br />movement over three lanes instead of two <br />lanes thereby reducing the amount of <br />green time necessary to clear the queue. <br />In addition, there is a need to retrofit <br />the signal controller to include an <br />emergency vehicle preemption capability <br />since a City of Pleasanton Fire Station <br />is located nearby. The cost of <br />restriping and retrofitting the signal <br />controller is estimated at $10,000. <br />C. Additional Traffic Signals <br />1. Foothill Road/Laurel Creek $ 120,000.00 <br />2. Stoneridge Mall/Fabian Court $ 120,000.00 <br />Estimated Traffic Mitigation Improvements Costs $1,065,000.00 <br />G:\P\CJBOOO.W50/02Aug90a <br />EXHIBIT B <br />Page 3. of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.