My WebLink
|
Help
|
About
|
Sign Out
HEINZ, ROBERT AND SHAREN - DEVELOPMENT AGRMNT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
H
>
HEINZ, ROBERT AND SHAREN - DEVELOPMENT AGRMNT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 1:41:52 PM
Creation date
10/24/2007 9:56:38 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/4/2002
LONG TERM AGREEMENTS - NAME
HEINZ
LONG TERM AGREEMENTS - TYPE
DEVELOPMENTAGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/08/02 10:49 FAX 925 484 8234 <br />. TIMING OF PAYMENT OF SHARED INFRASTRUCTURE IMPROVEMENT <br />COSTS <br />Each Lot shall pay its pro rata share of the shared infrastructure improvement costs by <br />paying a fee or constructing improvements. If no improvements are constructed with • <br />development of any Lot, or if the cost of those improvements is less than that Lot's pro <br />rata share, a fee shall be paid. Specific Plan fees equal to each Lot's pro rata share of the <br />shared infrastructure improvements shall be collected in accordance with the following <br />programs. Final subdivision maps shall include both final maps and parcel maps. <br />Financing Program # 7. For subdivision of Lots creating new buildable lots, Specific <br />Plan fees shall be paid at the time the first final subdivision map for that Lot is filed for <br />City approval. <br />Financing Program #8. For existing homes, the applicable Specific Plan fees shall be <br />paid at the earlier of the following times: <br />• at the time a building permit for connection to the shared infrastructure <br />improvement is issued; or <br />• at the time the first subdivision of the Lot occurs. <br />The fees for existing homes are for shared infrastructure improvements only. The costs <br />of on -site water /sewer laterals and connection fees are the responsibility of the <br />homeowner. <br />Financing Program #9. For non - residential uses, the applicable Specific Plan fees shall <br />be paid at the earlier of the following times: <br />• at the time the first final subdivision map is filed for City approval: <br />• at the time a building permit is issued; or <br />• for the elementary school. at the time the first contract is let for the <br />school site or building improvements. <br />CALCULATION OF FEE AND ADJUSTMENTS <br />The Specific Plan fee is required to be first set and then adjusted to ensure that all . the <br />shared infrastructure will be financed. This requires initial estimates of costs followed by <br />adjustments as improvements are constructed, as plans are refined. and as costs are <br />affected over time. <br />Financing Program #10. The initial fee shall be based on the estimated costs for each <br />shared infrastructure improvement, the land uses shown in the Specific Plan, and the <br />coefficients for adjusting for the non - residential uses shown in the Specific Plan. The <br />initial fee shall be established for any Lot based on the following formula: <br />6 <br />CITY- PLEASANTON 0 009/022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.