My WebLink
|
Help
|
About
|
Sign Out
HEINZ, ROBERT AND SHAREN - DEVELOPMENT AGRMNT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
H
>
HEINZ, ROBERT AND SHAREN - DEVELOPMENT AGRMNT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 1:41:52 PM
Creation date
10/24/2007 9:56:38 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/4/2002
LONG TERM AGREEMENTS - NAME
HEINZ
LONG TERM AGREEMENTS - TYPE
DEVELOPMENTAGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/08/02 10:50 FAX 925 484 8234 <br />Total fee for Lot = (# Lot Water EDUs x estimated Water costsl <br />353 EDUs ] <br />+ (#Lot Sewer EDUs x estimated Sewer costsl <br />233 EDUs ] <br />+ [# Lot roadway EDUs x estimated Roadway costsl <br />608.5 EDUs <br />+ [ #Lot Detention Basin EDUs x estimated Detention Basin costsl <br />241.9 EDUs ] <br />+ [# Lot Utility EDUs x estimated Utility costsl <br />261.7 EDUs ) <br />+ [# Specific Plan Prep. EDUs x estimated Specific Plan Prep. costsl <br />239.7 EDUs <br />The number of EDUs assigned to each Lot for each infrastructure component is shown in <br />Table 2. <br />Initial costs for each shared infrastructure improvement shall be those costs estimated in <br />Table 1 as follows: <br />(a) Initial Water Costs = Estimated Costs of Parts I +2 +3 +4 +5 = $2.870.340 <br />(b) Initial Sewer Costs = Estimated Costs of Parts 1 +2 +3+4 +5 = $1.510.000 <br />(c) Initial Roadway Costs = Estimated Costs of Parts 1 +2 +3 +4 +5 = $3,835.579 <br />(d) Initial Detention Basins Costs = Estimated Costs of Parts 3 +4 = $672,000 <br />(e) Initial Utility Costs = Estimated Costs of Part 5 = $1,260.000 <br />(f) Initial Specific Plan Preparation Costs = Estimated Costs of Part 5 = $250.000 <br />Initial Roadway Costs shall be adjusted to reflect the total roadway cost after adjustments for <br />Ruby Hill's total cost share and previously installed roadway improvements (see Specific <br />Plan). <br />Example 10 A. The initial costs as described above result in the following fees: <br />New Residential Unit = $ 29,551 <br />Existing Home <br />Water Connection <br />Sewer Connection <br />As Part of Subdivision <br />Park <br />Elementary School <br />,Example 10B. Using a hypothetical example of only initial fees above (which <br />cannot occur because improvements would be required for any project), the <br />developer of Lot 9 would owe Specific Plan fees equal to 4 new lots x $29, 551 per <br />new residential unit, or 5118,204 upon initial subdivision. <br />Example IOC. As above, developer of Lot 4 would owe fees equal to 6 new lots x <br />529.551 per new residential unit plus 1 existing lot x $19,427 per existing home <br />as part of a subdivision, for a total of S196,733 upon initial subdivision. <br />CITY- PLEASANTON 0010/022 <br />7 <br />• 5 8.131 <br />• $ 6,481 <br />$ 19,427 <br />• 51,149, 444 <br />• 53.168.359 <br />
The URL can be used to link to this page
Your browser does not support the video tag.