Laserfiche WebLink
Infrastructure <br />Component <br />Type of Improvement <br />Estimated Cost <br />Sewer <br />Eight -inch sewer trunk line within the realigned <br />Vineyard Avenue from the new pump station to the <br />east end of Lot 18 <br />5160,000 <br />Roadway <br />Realignment of Vineyard Avenue from the east end of <br />the "S" -curve to the east end of Lot 18 <br />$1,500,000 <br />Storm Water <br />Detention <br />Outfall at Lot 18 <br />$21,000 <br />Infrastructure <br />Component <br />Type of Improvement <br />Estimated <br />Cost <br />Sewer <br />Twelve -inch replacement trunk line from Bernal Avenue to <br />Tioga Court <br />$430.000 <br />Sewer <br />Ten -inch trunk line from Tioga Court to the southwest corner <br />of Lot 8 at Vineyard Avenue <br />5200.000 <br />Roadway <br />Sidewalk (including retaining wall) along the south side of <br />Vineyard Avenue from the western border of Lot 1 to Lot 15 <br />$180,000 <br />Infrastructure <br />Component <br />Type of Improvement <br />Estimated Cost <br />Water <br />Sixteen -inch water trunk line within the existing <br />Vineyard Avenue, and Zone 7 Tum -out #6 <br />modifications <br />5960.000 <br />Sewer <br />Sewer pump station and force main <br />$520.000 <br />08/08/02 10:53 FAX 925 484 8234 <br />CITY - PLEASANTON 0=1]018/022 <br />TABLE 1 <br />Shared Infrastructure Improvement Components and Estimated Costs <br />Part 1- Includes Lots 1-17 located in the western portion of the Vineyard Avenue Corridor area. <br />Part 2 - Includes Lots 22 -24 located south of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor area. <br />Part 3 - Includes Lot 18 located north of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor Area. <br />