Laserfiche WebLink
Infrastructure <br />Component <br />Type of Improvement <br />Estimated Cost <br />Water <br />Water tank, supply line, and pump station <br />reimbursement to City (improvements to be <br />constructed at such time as considered to be necessary <br />by the City <br />$1.900.000 <br />Utility <br />Undergrounding <br />Utilities undergrounding along the Lot 18 frontage of <br />the existing Vineyard Avenue <br />$1,260,000 <br />Specific Plan <br />Preparation* <br />Reimbursement of Specific Plan consultant fees <br />to the City • <br />$250,000 <br />Vista Diablo <br />Water <br />Reimbursement <br />Reimbursement for $10,340 shared water <br />improvements <br />$ 10,340 <br />Vista Diablo <br />• Roadway <br />Reimbursement <br />• Reimbursement for $285,579 shared roadway <br />improvements to Vineyard Avenue <br />$285.579 <br />Infrastructure <br />Component <br />Type of Improvement <br />Estimated Cost <br />Sewer <br />Eight -inch sewer trunk line within the realigned <br />Vineyard Avenue from the east end of Lot 18 to the <br />eastern boundary of the Specific Plan Area <br />$200.000 <br />Roadway <br />Realignment of Vineyard Avenue from the east end of <br />Lot 18 to the eastern Specific Plan Area boundary, and <br />trail and landscape improvements to the existing <br />Vineyard Avenue section between the northwest corner <br />of Lot 8 ( "S "- curve) and the eastern border of the Plan <br />Area <br />$1.870,000 <br />. <br />Storm Water <br />Detention <br />All planned storm water detention facilities east of <br />Lot 18, plus outfall at Lot 32 <br />5651,000 <br />08/08/02 10:53 FAX 925 iR4 8234 <br />CITY- PLEASANTON 1 019/022 <br />Part 4 - Includes Lots 19 (planned partially for the school site). 20.21. and 25 -33 located in the <br />eastern portion of the Vineyard Corridor area. <br />Part 5 - Relates to all lots within the Specific Plan Area (Lots 1 -33). Part 5 consists of all of the <br />"non- minimum" shared infrastructure improvements. <br />