My WebLink
|
Help
|
About
|
Sign Out
JL CONSTRUCTION - REIMBURSEMENT AGMT FOR CANYON MEADOWS OFF-SITE IMPROVEMENTS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
J
>
JL CONSTRUCTION - REIMBURSEMENT AGMT FOR CANYON MEADOWS OFF-SITE IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2007 3:03:30 PM
Creation date
10/24/2007 2:10:20 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/16/1988
LONG TERM AGREEMENTS - NAME
JL CONSTRUCTION
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CANYON MEADOWS OFF-SITE IMPROVEMENTS <br />(DUBLIN CANYON ROAD INTERIM ALIGNMENT) <br />PRELIMINARY ESTIMATE <br />Descri tion <br />Earthwork <br />A.C. Pavement <br />(.3'/.55'/.95') <br />A.C. Dike <br />Median Curb <br />Caltrans Type 2 <br />Retaining Wall <br />Box Culvert Extensions <br />Extend Exist. 18" S.D. <br />and place RIP RAP <br />Alameda Co. Type I <br />Catch Basin <br />Driveway Reconstruction <br />10" PVC Sanitary Sewer <br />10" ABS Sanitary Sewer <br />10" D.I. Sanitary Sewer <br />Manholes <br />12" Water <br />Fire Hydrants <br />Striping <br />Signing <br />Relocate Joint Poles <br />Monuments <br />Street Lights <br />Right-of-Way Acquisition <br />1. Legal Fees <br />2. Land Cost <br />Qua_ ~ Unit Unit Price Amount <br />7,000 C.Y. $ 5.00 $ 35 <br />000 <br />00 <br />77,718 S.F. 2.70 , <br />. <br />209,839.00 <br />6,447 L.F. 4.00 25,788.00 <br />2,094 L.F. 8.00 16,752.00 <br />342 L.F. 100.00 34,200.00 <br /> L.S. 75,000.00 <br /> L.S. 10,000.00 <br />4 EA. 1,250.00 <br />5,000.00 <br />9 EA. 1,500.00(AVE) 13 <br />500.00 <br />3,512 L.F. 49.00 , <br />172,088.00 <br />380 L.F. 51.00 19,380.00 <br />477 L.F. 54.00 25,758.00 <br />12 EA. 2,500.00 30,000.00 <br />4,442 L.F. 45.00 199,890.00 <br />8 EA. 2,500.00 20 000.00 <br /> L.S. 10,000.00 <br /> <br />12 L.S. <br />EA. <br />3,000.00 2,000.00 <br />36,000.00 <br />8 EA. 300.00 2,400.00 <br />15 EA. 2,500.00 37 500.00 <br />(0.62 ac. @ $200,000/ac.) <br />SUBTOTAL <br />Contingency @ 7~ <br />TOTAL (Excluding Interim Pump Station) <br />15,000.00 <br />124,000.00 <br />$1,119,095.00 <br />78,337 00 <br />$1,197,432.00 <br />8 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.