Laserfiche WebLink
EXHIBIT A <br />Interim Pumo Station Costs <br />Booster Pump Station <br />CDM Engineering Fee - <br />Booster Pump Station <br />SUBTOTAL - Pump Station <br />L.S. <br />Contingency for Pump Station @ 7$ <br />~T~ PiTMP STATION COSTS <br />TOTAL (Including Pump Station Costs) <br />9 <br />$ 450,000.00 <br />40,000 00 <br />$ 496,000.00 <br />34, 000 00 <br />$ 524,300.00 <br />1,721,732.00 <br />Page 2 of 2 <br />