My WebLink
|
Help
|
About
|
Sign Out
PLEASANTON STATION ASSOCIATES
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PLEASANTON STATION ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 11:35:55 AM
Creation date
10/29/2007 11:34:05 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/11/1984
LONG TERM AGREEMENTS - NAME
PLEASANTON STATION
LONG TERM AGREEMENTS - TYPE
DEFERRED AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEFERRED IMPROVEMENT AGREEMENT <br />THI5 AGREEMENT is made and entered into on the 1~ day of <br />~~!~Q~~2,~~,J , 1984, by and between PLEASANTON STATION ASSOCI- <br />ATES (hereinafter referred to as "Developer") and the CITY OF <br />PLEASANTON, a municipal corporation (hereinafter referred to as <br />"City"). The City and Developer agree as set forth below. <br />WITNESSETH: <br />A. Developer is the lessee of real property in the City of <br />Pleasanton described in Exhibit "A", attached to this agreement <br />and made a part of it by this reference, which consists generally <br />of an approximately 4.6 acre site located between First Street <br />and the Southern Pacific railroad tracks from Angela Street to <br />Bernal Avenue extension and on the Southern Pacific depot site. <br />B. Developer has applied for and received City approval to <br />construct five commercial buildings consisting of 70,000 sq. ft. <br />on the subject site. <br />C. As a condition of development approval, the Developer is <br />required to replace the existing six-inch sanitary sewer main <br />with a new 12-inch V.C.P. sanitary sewer main from the intersec- <br />tion of First Street and Abbie Street to the intersection of <br />First Street and Angela Street. Developer is also required to <br />install a 15-inch V.C.P. sanitary sewer main from the existing <br />manhole at the intersection of First Street and Bernal Avenue to <br />the intersection of First Street and Abbie Street on First <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.