My WebLink
|
Help
|
About
|
Sign Out
PRUDENTIAL INSURANCE 1984
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PRUDENTIAL INSURANCE 1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 3:05:10 PM
Creation date
10/29/2007 2:11:24 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/10/1984
LONG TERM AGREEMENTS - NAME
PRUDENTIAL INSURANCE
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDM ~ CAMP DRESSER 6 McKEE INC. <br />environmental engineers, scientists, <br />planners, 6 management consultants 710 South Broadway, Suite 201 <br /> Walnut Creek, California 94598 <br /> 415 933-2900 <br />December 3, 1985 <br />Mr. Robert T. Okamura <br />City Engineer <br />City of Pleasanton <br />P.O. Box 520 <br />Pleasanton, CA 94566 <br />Water System Improvements <br />Dear Bob: <br />In performing the Water Master Plan study, we have determined that addi- <br />tional water system improvements are needed in 1986 for the City to con- <br />tinue to provide adequate water service throughout Pleasanton. During the <br />past several months, we have discussed these needs and on May 13th, we <br />wrote a letter to Bob Warnick describing in detail the needed improvements. <br />On September 4th we submitted a proposal to you and, as a result of our re- <br />cent discussion regarding the proposal, you requested that we prepare a <br />revised proposal that would separate out the initial work on two of the <br />water system improvements. We have done as you requested and are pleased <br />to submit this revised proposal. <br />SCOPE OF SERVICES <br />The needed improvements are: <br />1. A new turnout from the Zone 7 system to meet 1986 and future deli- <br />very needs. Also, remove pipe and valve restrictions at the <br />existing Turnout Nos. 1, 2, 3, and 4. <br />Estimated Cost of Construction: $200,000 for new turnout, and <br />$10,000 each for the four existing turnouts = $240,000. <br />2. A relocated Foothill Booster Pump Station No. 1 that would be con- <br />structed downhill from the existing pump station on Longview <br />Drive. With the pump station at a lower elevation, the suction <br />pressure for the pumps will be appropriate. Some of the existing <br />pumps, motors, piping, and electrical service may be utilized at <br />the new site. <br />Estimated Cost of Construction: $150,000 <br />3. New pump, motor, piping, and electrical facilities at individual <br />booster pump systems for homes west of Foothill Road that will be <br />`~ ~ uS'i <br />M1 ~ A'.:~ <br />~ph <br />
The URL can be used to link to this page
Your browser does not support the video tag.