My WebLink
|
Help
|
About
|
Sign Out
TRAMMELL CROW - AGREEMENT FOR INSTALLATON & MAINTENANCE OF LANDSCAPING
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
T
>
TRAMMELL CROW - AGREEMENT FOR INSTALLATON & MAINTENANCE OF LANDSCAPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2007 4:30:19 PM
Creation date
11/2/2007 2:01:10 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/3/1982
LONG TERM AGREEMENTS - NAME
TRAMMELL CROW
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
LANDSCAPE MAINTENANC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Impact on Public Services <br />(fire, pol'ce, schools, parks, mainten~nce,,etc.)) <br />Services have been exten~ed to this area in conjunction with tfie development of <br />the regional shopping center. The continued development of the area will require <br />additional fire department manpower & equipment to adequately maintain services & <br />public safety levels. A critical analysis of existing fire protection capabilities <br />& recommendations for any additional manpower & apparatus should be made. This. <br />applicant should participate in the funding of such a study & in efforts to <br />secure improvements to service levels as required. <br />10. Impact on Utilities <br />( ater ew r to water draina e sglid w~~te~hee cd~velo ment of <br />Utilities have ~ een ~x~ende$ ~o ~~iis area in co~~dnc ion w p <br />the regional shopping center. On-site improvements will be subject to specific <br />conditions & requirements. Water supply capabilities for this area may be limited <br />& additional development in this area of the City may strain the system. A <br />study of the. current system should be made to ascertain the improvements which <br />will be needed to supply the projected development. This applicant should <br />participate in the funding of such a study & in measures to upgrade facilities <br />as required. <br />( 11. Growth-Inducing Impact <br />\ ..e site is adjacent to other commercial & office uses, proposed or existing. <br />This project will facilitate the development of uses compatible with the <br />establishment of this regional commercialloffice center. <br />12. Energy Impacts <br />Commercial office structures are subject to local and state energy conservation <br />standards. <br />13. Aesthetic Impacts <br />(obstruction of views, design,etc.) <br />I-580 is a designated scenic route. Structure design, landscaping, lighting, and <br />signs will be subject to the City's design review process & will be considered <br />in light of aesthetic goals & policies. <br />14. Impacts on Archaeological or Historical Sites <br />No known sites are present. <br />u' <br />a <br />u <br />a~ ~ <br />.~ w <br />D, G <br />N 00 <br />~ ~ <br />,~ <br />u <br />w <br />,~ <br />00 <br />N <br />G <br />H <br />X <br />X <br />I~ <br /> <br />u <br />q ~U <br />~a a~ <br />U i~ <br />~ c~ <br />~ oa <br />~ •.~ <br />~ ~ <br />00 •~ <br />~ ~ <br />H r{ <br /> <br /> <br />- 3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.