My WebLink
|
Help
|
About
|
Sign Out
DUBLIN, CITY OF 1982
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
D
>
DUBLIN, CITY OF 1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2008 9:36:34 AM
Creation date
11/8/2007 4:34:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/27/1982
LONG TERM AGREEMENTS - NAME
DUBLIN
LONG TERM AGREEMENTS - TYPE
STREET IMPROVEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT FOR CONSTRUCTION, OPERATION <br />AND MAINTENANCE OF TRAFFIC-SIGNALS ON HOPYARD/DOUGHERTY <br />ROAD AT I-580 WESTBOUND OFF-RAMP <br />THIS AGREEMENT is made and entered into this 27th day <br />of December 1982, by and between the CITY OF DUBLIN (herein- <br />after "Dublin"), a municipal corporation, and the CITY OF <br />PLEASRNTON (hereinafter "Pleasanton"), a municipal corporation, <br />based on the following understandings: <br />W I T N E S S E T H <br />WHEREAS, on the basis of present traffic conditions and <br />projected short-term traffic growth, it is desirable to in- <br />stall certain roadway improvements and traffic signals as <br />shown on Exhibit "A", attached hereto, at the intersection <br />of Hopyard/Dougherty Road and the Interstate 580 westbound <br />off-ramp (hereinafter referred to as the "Project"); <br />WHEREAS, the Project would be located within the corporate <br />limits of Dublin but would be subject to the jurisdiction of <br />the California Department of Transportation (Caltrans) for <br />both construction, operation and maintenance; <br />WHEREAS, the Hopyard/Dougherty Road and Interstate 580 <br />westbound off-ramp intersection operation and capacity are <br />important to the efficient flow of traffic entering and leav- <br />ing the major projects under construction in northern <br />Pleasanton and entering and leaving Dublin via Dougherty Road, <br />and, as such, the operation of the proposed traffic signals <br />is appropriately coordinated with other traffic signals <br />regulating traffic flows from Dublin Boulevard in Dublin <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.