Laserfiche WebLink
<br />which Construction Management Plan shall be consistent with this Agreement in all respects, and shall <br />include (i) a complete description of the timing for construction of the Improvements covered thereby; <br />(ii) a traffic control plan for assuring continual and uninterrupted access to the Quarry Lands over EI <br />Charro Road during construction as more fully described in Section 3.2; (iii) the names of all prime <br />contractors and expected subcontractors; (iv) contact names and phone numbers at the Jurisdiction, the <br />prime contractor and each subcontractor; and (v) a requirement for the provision of written monthly <br />progress reports covering the construction of the Improvements. <br /> <br />2.5 "Dedication Deed" shall mean a deed of the Dedication Parcel in the form of <br />Exhibit I attached hereto and incorporated herein by this reference, from Vulcan to County if Livermore <br />is the Constructing Jurisdiction and has completed the required Improvements thereon, or from Vulcan to <br />Pleasanton if Pleasanton is the Constructing Jurisdiction and has annexed the Dedication Parcel pursuant <br />to the provisions of Section 3.8 and completed the required Improvements thereon. <br /> <br />2.6 "Dedication Parcel" shall mean that portion of Vulcan's private EI Charro Road <br />right:-of-way that is to contain the EI Charro and Intersection Improvements, as such area is more <br />particularly described and depicted in Exhibits J-l and J-2, respectively, attached hereto and <br />incorporated herein by this reference. <br /> <br />2.7 "Effective Date" shall mean, subject to the provisions of Section 17, the last date <br />of a party's execution of this Agreement, as such date is set forth following the parties' respective <br />signatures below. <br /> <br />2.8 "EI Charro and Intersection Improvements" shall mean the ultimate rights of way <br />and road and intersection improvements (including pavement, curb and gutter, drainage, number and <br />configuration of lanes, levels of service, signalization, signage, lighting, and safety features) required for <br />that portion of EI Charro Road from the Interchange improvements currently anticipated to be installed by <br />the City of Dublin to, and including, the EI Charro Transition, and further including (i) the EI Charro/Jack <br />London/Stoneridge Intersection, (ii) the curb returns for each of Stoneridge Drive and Jack London <br />Boulevard from the edge of the El Charro Road right':'of-way; and (iii) the relocation of any utilities; and <br />, (iv) the closure of the El Charro Road / Freisman Road intersection existing as of the Effective Date; all <br />as shown on the EI Charro and Intersection Improvements Diagrams. EI Charro and Intersection <br />Improvements also shall include the abandonment of Freislnan Road at the EI Charro Road / Freisman <br />Road intersection and the No Access Signage. If Pleasanton is the Constructing Jurisdiction, EI Charro <br />and Intersection Improvements shall also include a new roadway connecting Freisman Road to the EI <br />Charro/Jack LondonlStoneridge Intersection. <br /> <br />2.9 "EI Charro and Intersection Improvements Diagrams" shall mean the diagrams <br />set forth in Exhibit K-l and K-2 attached hereto and incorporated herein by this reference. Exhibit K-l <br />shows the EI Charro and Intersection Improvements to be constructed if Livermore is the Constructing <br />Jurisdiction. Exhibit K-2 shows the El Charro and Intersection Improvements to be constructed if <br />Pleasanton is the Constructing Jurisdiction. The parties acknowledge that the EI Charro and Intersection <br />Improvements Diagrams include the depiction of a portion of the Interchange designated thereon as "By <br />Others" and that such portion may not be fully and accurately depicted on such diagrams. <br /> <br />2.10 "EI Charro/Jack LondonlStoneridge Intersection" shall mean the proposed <br />intersection of EI Charro Road, Jack London Boulevard and Stoneridge Drive to be constructed by or at <br />the direction of the Constructing Jurisdiction pursuant to this Agreement. <br /> <br />2.11 "EI Charro Transition" shall mean the transition road and related improvements <br />connecting Vulcan's existing private EI Charro Road to the widened public portion of EI Charro Road as <br /> <br />002483.0004\79369 l.l 3 <br /> <br />5 <br />