Laserfiche WebLink
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />indicate sufficient saturation. The subgrade for other flatwork slabs should be <br />thoroughly wetted prior to the pouring of concrete. <br />b. Driveway slabs should be underlain by a minimum of 4 inches of angular gravel <br />or clean crushed rock material placed between the finished subgrade and the slabs <br />to serve as a capillary break between the subsoil and the slab. See the "Guide <br />Specifications For Rock Under Floor Slabs", Appendix C. <br />c. The slabs should be adequately reinforced as determined by the project structural <br />engineer for the anticipated loads. The reinforcement shall be placed in the center <br />of the slab unless otherwise designated by the design engineer. <br />d. All exterior flatwork slabs should be poured structurally independent of the <br />foundations. A 30-pound felt strip, expansive joint material, or other positive <br />separator should be provided around the edge of all floating slabs to prevent bond <br />to the structure foundation. <br />Retaining Walls and Sound Walls <br />51. Any retaining walls that are to be incorporated into the development should be designed <br />to resist lateral pressures exerted from a media having an equivalent fluid weight as follows. <br />~radier~t of Equivalent Fluid Weight (p c f.~~' ~oeffic~,nt = ~~~` <br />~ B~cl` S1npe~'` ~Y ~" ~ ~~ `'' _ ~ ~ `'j s r F' 7 ofFriction <br /> UIU'es~rained, x~; Passive '` <br /> <br />~ ~ Condrtian <br />~ <br />~ <br />. Resistance: <br /> <br />: <br />~" . ~ E <br />Horizontal 45 300 0.30 <br />2:1 65 300 0.30 <br />TERRASEARCH, inc. Page 25 of 53 <br />