My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigatioa/Vineyard Avenue, Pleasanton 8 August 2003 <br />embedment) maybe used in the design. Spacing should be determined, as required, by the load <br />distribution but minimum spacing should not be less than 3 pier diameters, center to center. <br />Maximum spacing should be determined by the Structural Engineer. <br />47. Reinforced concrete grade beams should be used to support the perimeter walls and, if <br />desired, certain bearing walls of the building structure. Reinforcing steel should be provided as <br />necessary for structural support and continuity of pier and grade beam. <br />48. The bottom of friction piers must be cleaned to remove excessive loose material that may <br />accumulate at the bottom during drilling. Up to a maximum of 4 inches of loose soil is permitted to <br />be left in the bottom of the pier hole, provided the loose material is tamped prior to steel placement <br />or concrete pour. The Soil engineer must verify that the piers have been cleaned or sufficiently <br />tamped. <br />49. It is important that care be exercised to ensure that any concrete spills during the concrete <br />pour must be removed and no "mushrooming" effects are allowed to remain around the top of the <br />pier or bottom of the grade beam. <br />Concrete Flatwork Slab-on-Grade Construction <br />50. It is expected that the concrete slabs-on-grade including public sidewalks, driveways and <br />other landscape flatwork may experience some cracking due to the expansive nature of the soil <br />on the site. To reduce the potential cracking of concrete, the following are recommended: <br />a. To decrease the amount of potential swelling, the driveway subgrade soil in the <br />upper 12 to 18 inches should be saturated until a moisture equilibrium is achieved <br />(minimum 5% above optimum moisture) before the slab is poured. The Soil <br />Engineer should observe and verify the subgrade soil saturation before the slabs <br />are poured. Typically, 12 inches of penetration with a thin metal probe may <br />TERRASEARCH, inG Page 24 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.