My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />64. All aggregate base material placed subsequently should also be compacted to a minimum <br />relative compaction of 95% based on the ASTM D1557-91 Test Procedure. The construction of <br />the pavement in the pavement areas should conform to the requirements set forth by the latest <br />Standard Specifications of the Department of Transportation of the State of California and/or <br />City of Pleasanton, Department of Public Works. <br />65. If planter areas are provided within or immediately adjacent to the pavement areas, <br />provisions should be made to control irrigation water from entering the pavement subgrade. <br />Water entering the pavement section at subgrade level, which does not have a means for <br />discharge, could cause softening of this zone and, subsequently, pavement failure will occur. <br />66. In order to mitigate this condition, it is recommended that the subgrade beneath curb and <br />gutter be graded such that it has a positive fall towards the catch basins where a 2-foot long <br />subdrain will discharge any accumulated water into the catch basin. The subdrain trench should <br />be a minimum 6 inches deep and consist of a 4-inch perforated solid wall PVC pipe surrounded <br />and underlain by Class II permeable material. The inlet portion of the subdrain pipe should be <br />capped. <br />Utility Trenches <br />67. Applicable safety standards require that trenches in excess of 5 feet must be properly <br />shored or that the walls of the trench slope back to provide safety for installation of lines. If <br />trench wall sloping is performed, the inclination should vary with the soil type. The underground <br />contractor should request an opinion from the Soil Engineer as to the type of soil and the <br />resulting inclination. <br />68. With respect to state-of--the-art construction or local requirements, utility lines are <br />generally bedded with granular materials. These materials can convey surface or subsurface <br />water beneath the structures. It is, therefore, recommended that all utility trenches which possess <br />the potential to transport water be sealed with a compacted impervious cohesive soil material or <br />TERRASE,9RCH, inc. Page 29 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.