My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Invesrigation/Vineyard Avenue, Pleasanton <br />8 August 2003 <br />Pavement Design <br />61. Pavement Sections: Based on our experience with similarly soils in the area, an R-value <br />of 10 will be assumed for preliminary design. The recommended design thicknesses presented <br />below were calculated in accordance with the methods presented in Topic 608 of the California <br />Department of Transportation Highway Design Manual. <br />Table 1: Recommended Asphalt Concrete Pavement Sections <br />~~ DESYGN .`~ CRETE <br />.-r-ASPI.TAL . C~O ~ G GATE':BA ~ ~ ' <br />TRAFFIC INDEX: ~'~ . <br />'\ ~'` (TYPE B} inches '... '` (CLASS ?) inches'- '~' <br />4.5 2.5 9.5 <br /> 3.0 8.5 <br />5.0 2.5 11.0 <br /> 3.0 10.0 <br />6.0 3.0 13.5 <br /> 3.5 12.5 <br />Notes: <br />(1) Minimum R-Value = 78 <br />(2) All layers in compacted thickness to Cal-Trans Specifications <br />62. Please note that the above design is preliminary. It is recommended that after rough <br />subgrade is achieved, and underground utilities are near completion, representative samples of <br />soil should be collected and tested to determine the actual R-Values so that a final design maybe <br />obtained. <br />63. After underground facilities have been placed in the areas to receive pavement and <br />removal of excess material has been completed, the upper 6 inches of the subgrade soil should be <br />scarified, moisture conditioned and compacted to a minimum relative compaction of 95°io at 2 to <br />3% above optimum moisture content accordance with the grading recommendations specified in <br />this report. The pavement subgrade should not be allowed to dry excessively before covering <br />with aggregate base. <br />TERRASEARCH, inG Page 28 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.