My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />3.2 Any soil deemed soft or unsuitable by the Soil Engineer shall be removed. Any existing <br />debris or excessively wet soils shall be excavated and removed as required by the Soil Engineer <br />during grading. <br />3.3 All underground structures shall be removed from the site such as old foundations, <br />abandoned pipe lines, septic tanks, and leach fields. <br />3.4 The final stripped excavation shall be approved by the Soil Engineer during construction <br />and before further grading is started. <br />3.5 After the site has been cleared, stripped, excavated to the surface designated to receive <br />fill, and scarified, it shall be disked or bladed until it is uniform and free from large clods. The <br />native subgrade soils shall be moisture conditioned and compacted to the requirements as <br />specified in the grading section of this report. Fill can then be placed to provide the desired <br />finished grades. The contractor shall obtain the Soil Engineer's approval of subgrade compaction <br />before any fill is placed. <br />4. Materials <br />4.1 All fill material shall be approved by the Soil Engineer. The material shall be a soil or <br />soil-rock mixture which is free from organic matter or other deleterious substances. The fill <br />material shall not contain rocks or lumps over 6 inches in greatest dimension and not more than <br />15% larger than 2-1/2 inches. Materials from the site below the stripping depth are suitable for <br />use in fills provided the above requirements are met. <br />4.2 Materials existing on the site are suitable for use as compacted engineered fill after the <br />removal of all debris and organic material. All fill soils shall be approved by the Soil Engineer in <br />the field. <br />4.3 Should import material be required, it must meet the requirements as specified in the <br />body of this report prior to transporting it to the project. <br />5. Placing, Spreading, and Compacting Fill Material <br />5.1 The fill materials shall be placed in uniform lifts of not more than 8 inches in <br />uncompacted thickness. Each layer shall be spread evenly and shall be thoroughly blade mixed <br />during the spreading to obtain uniformity of material in each layer. Before compaction begins, <br />the fill shall be brought to a water content that will permit proper compaction by either (a) <br />aerating the material if it is too wet, or (b) spraying the material with water if it is too dry. <br />TERRASEARCH, inG Page 50 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.