My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />5.2 After each layer has been placed, mixed, and spread evenly, either import material or <br />native material shall be compacted to a relative compaction of 90% at a moisture content 2 to 3% <br />above optimum as determined by ASTM D1557-91 Laboratory Test Procedure. <br />5.3 Compaction shall be by footed rollers or other types of acceptable compacting rollers. <br />Rollers shall be of such design that they will be able to compact the fill to the specified density. <br />Rolling shall be accomplished while the fill material is within the specified moisture content <br />range. Rolling of each layer shall be continuous over its entire area and the roller shall make <br />sufficient trips to ensure that the required density has been obtained. No ponding or jetting shall <br />be permitted. <br />5.4 Field density tests shall be performed by the Soil Engineer in accordance with Laboratory <br />Test Procedure ASTM D2922-91 and D3017-88. When footed rollers are used for compaction, <br />the density tests shall be taken in the compacted material below the surface disturbed by the <br />roller. When these tests indicate that the compaction requirements on any layer of fill, or portion <br />thereof, has not been met, the particular layer, or portion thereof, shall be reworked until the <br />compaction requirements have been met. <br />5.5 No soil shall be placed or compacted during periods of rain nor on ground which contains <br />free water. Soil which has been soaked and wetted by rain or any other cause shall not be <br />compacted until completely drained and until the moisture content is within the limits <br />hereinbefore described or approved by the Soil Engineer. Approval by the Soil Engineer shall be <br />obtained prior to continuing the grading operations. <br />6. Pavement <br />6.1 The proposed subgrade under pavement sections, native soil, and/or fill shall be <br />compacted to a minimum relative compaction of 95% at a moisture content slightly above <br />optimum for a depth of 6 inches. <br />6.2 All aggregate base material placed subsequently should also be compacted to a minimum <br />relative compaction of 95% based on the ASTM Test Procedure D1557-91. The construction of <br />the pavement in the parking and traffic areas should conform to the requirements set forth by the <br />latest Standard Specifications of the Department of Transportation of the State of California <br />and/or City of Pleasanton, Department of Public Works. <br />6.3 It is recommended that soils at the proposed subgrade level be tested for a pavement <br />design after the preliminary grading is completed and the soils at the site design subgrade levels <br />are known. <br />TERRASEARCH, inG Page 51 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.