My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />7. Utility Trench Backfill <br />7.1 The utility trenches extending under concrete slabs-on-grade shall be backfilled with <br />native on-site soils or approved import materials and compacted to the requirements pertaining to <br />the adjacent soil. No ponding or jetting will be permitted. <br />7.2 Utility trenches extending under all pavement areas shall be backfilled with native or <br />approved import material and properly compacted to meet the requirements set forth by the City <br />of Pleasanton, Department of Public Works.* <br />*NOTE: Requirements of City to be added. <br />7.3 Where any opening is made under or through the perimeter foundations for such items as <br />utility lines and trenches, the openings must be resealed so that they are watertight to prevent the <br />possible entrance of outside irrigation or rain water into the underneath portion of the structures. <br />8. Subsurface Line Removal <br />8.1 The methods of removal will be designated by the Soil Engineer in the field depending on <br />the depth and location of the line. One of the following methods will be used. <br />8.2 Remove the pipe and fill and compact the soil in the trench according to the applicable <br />portions of sections pertaining to compaction and utility backfill. <br />8.3 The pipe shall be crushed in the trench. The trench shall then be filled and compacted <br />according to the applicable portions of Section 5. <br />8.4 Cap the ends of the line with concrete to prevent entrance of water. The length of the cap <br />shall not be less than 5 feet. The concrete mix shall have a minimum shrinkage. <br />9. Unusual Conditions <br />In the event that any unusual conditions not covered by the special provisions are encountered <br />during the grading operations, the Soil Engineer shall be immediately notified for additional <br />recommendations. <br />TERRASEARCH, inc. Page 52 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.