My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be a very attractive amenity to the City of Pleasanton. It will not be a Hayward Hotel - <br />it's not being perched on the top of the hill. The hill is graded. All of the fill material <br />that is removed for the cut will be used on the property so that nothing will be exported <br />out of the site. And those are the two primary issues that we need some help with. <br />Certainly, there are other issues as far as the design and the color, but we need to know if <br />this location is acceptable. Can we make it work for not only the Planning Commission, <br />but also the citizens of Pleasanton? And is there enough flexibility in the Vineyard <br />Corridor Specific Plan to allow this to happen? I believe there is. <br />We basically need to know if a flat-pad home such as the one that is proposed, with <br />multiple stories, is acceptable. Or do you really, truly want astep-up-the-hill kind of a <br />thing that would be significantly more visible in this particular area, and not fit in with <br />the needs and interests with the Sariches? I will be happy to answer a lot more questions, <br />but we built this with the intent of flexibility; we built it to try to not have to go back in <br />and amend the Vineyard Corridor Specific Plan. There have been a number of instances <br />where people have tried to amend this Plan to add more units or to do different things, <br />and we have thought very diligently as a City and as a Council to not do that, to not <br />re-open it, because if we open it, we will re-open Pandora's Box. <br />And again, we'll be available to answer any questions you have. I would like to <br />_ .:introduce the architect on this project; Mr. John McInnis. John is an internationally -` <br />famous architect. He is building homes all around the world, in Europe, in the United <br />States. He has an international reputation and is someone that the City of Pleasanton <br />would be very happy to have designed one of the homes here in Pleasanton. This is a <br />.house that has been thought of in really.: an environmentally sensitive way. We have= <br />'..:minimized the impact on the environment on this ability: There are 16 heritage or close <br />. _ ' ' ao heritage trees that are going to be removed, probably a total of about 60 trees removed <br />. - all together, and there's probably no other site that we could use on this property that: <br />would minimize the amount of tree removal and the negative impact on visibility and the <br />environment. So, without further ado, I want to introduce Mr. John McInnis. <br />Mr. McInnis: Good evening, Commissioners and Chair Maas, and staff. Thank you, Donna, that <br />was a very good presentation. I would like to first share with you the first comments that <br />came from Dan and Belinda Sarich when I started this project. I met with them on , <br />October and November of 2001. They asked me to create a magnificent European villa, <br />one that they would love to live in and that the City of Pleasanton would love to have and <br />be proud of. So, as an architect, that's a good start. Three and a half years later, I think <br />we have done that. We have worked very hard with staff, so let me share with you kind <br />of where or how we got to this point right now. <br />In December of 2001, I met with Brian Swift and Greg Plucker. I got a program from the <br />clients and had done some research on the style of home that we're going to do. I have <br />an Italian architect who has worked forme for many years, so we buy a lot of our <br />materials there. I do a lot of my research; clients have me review hotels, houses, and I <br />incorporate them not only here, but there also. All I do is custom homes. From that, <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.