Laserfiche WebLink
Dan Sarich HortScience, Inc. <br />Sarich Property Tree Preservation Page 8 <br />Recommendations for tree protection during construction <br />1. No grading, construction, demolition or other work shall occur within the TREE <br />PROTECTION ZONE. Any modifications must be approved and monitored by the <br />Consulting Arborist. <br />2. Any root pruning required for construction purposes shall receive the prior <br />approval of, and be supervised by, the Consulting Arborist. <br />3. if injury should occur to any tree during construction, it should be evaluated <br />as soon as possible by the Consulting Arborist so that appropriate treatments <br />can be applied. <br />4. Root-injured trees have a limited capacity to absorb water. Therefore, it is <br />important to insure adequate soil moisture in the area of active roots. One to <br />several irrigations may be needed for trees that are at risk. Irrigations should <br />be specified by the Consulting Arborist. <br />5. No excess soil, chemicals, debris, equipment or other materials shall be <br />dumped Or Stored wlthln the TREE PROTECTION ZONE. <br />6. Any additional tree pruning needed for clearance during construction must be <br />,~~ performed by a Certified Arborist and not by construction personnel. <br />HortScience, Inc. <br />Ed Brennan <br />Certified Arborist #WC-0105 <br />Registered Consulting Arborist #373 <br />i <br />~J <br />J <br />