My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ~ ~~ <br />Dan Sarich HortScience, Inc. <br /> Sarich Property Tree Preservation Page 7 <br /> (continued from previous page) <br />1 <br />l <br /> Tree No. Species Trunk diameter Appraised <br />1 (inches) value <br /> 104 Blue oak 15 $2,850 <br /> 108 Blue oak 23 $700 <br /> 110 Blue oak 8 $250 <br />950 <br />12 $1 <br /> , <br />122 Blue oak <br />- 123 Blue oak 10,9 - $2,350 <br />- 129 Blue oak 14 $550 <br />~ 130. Blue oak 13 $1,700 <br />~ 137 Blue oak 8 $250 <br /> 190 Blue oak 36 $11,050 <br />1 191 Blue oak 13 $1,700 <br />_ <br />J 192 Blue oak 20 $4,800 <br /> 193 Blue oak 16 $3,200 <br /> <br />r 194 Blue oak 17, 11 $3,800 <br />~ .195 Blue oak 19 $4,350 <br /> 196 Blue oak 7 $100 <br /> 199 Blue oak 38 $15,450 <br />'~ 208 Blue oak 11 $1,300 <br />~ 209 Blue oak 14 $1,950 <br /> 211 Blue oak 22 $4,450 <br /> 219 Blue oak 14,3 $2,600 <br /> 220 Blue oak 12 $1,950 <br />\ ~ <br />- <br />:-l 223 Blue oak 15 $650 <br />_.l <br />Tree Preservation Guidelines <br /> The goal of tree preservation is not merely tree survival during development but <br /> maintenance of tree health and beauty for many years. Trees retained on sites <br /> that are either subject to extensive injury during construction or are inadequately <br /> maintained become a liability rather than an asset. The response of individual <br />J trees will depend on the amount of excavation and grading, the care with which <br /> demolition is undertaken, and the construction methods. These impacts can be <br /> minimized by coordinating any construction activity inside the TREE PROTECTION <br /> ZONE. <br /> The following recommendations will help reduce impacts to trees from <br /> development and maintain and improve their health and vitality through the <br /> clearing, grading and construction phases. <br /> Pre-construction treatments and recommendations <br /> 1. Fence all trees to be retained to completely enclose the TREE PROTECTION <br />k <br />li <br />i <br />h <br /> n <br />a <br />n <br />ZONE prior to demolition, grubbing or grading. Fences shall be 6 ft. c <br /> or equivalent as approved by consulting arborist. Fencing shall be placed at <br />} the dripline. Fences are to remain until all grading and construction is <br />.. completed. <br />J <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.