Laserfiche WebLink
falling within this criteria shall be flagged on the street improvement plans. <br />85. At the time the water and sewer lines are installed on this property, the existing <br />house shall be connected to City water and sewer and any existing septic tank and <br />leach field located on the property shall be abandoned per Alameda County Health <br />Department regulations. <br />86. Unless used for agricultural purposes or landscape irrigation, any existing wells <br />located on the property shall be abandoned per Zone 7 standards. <br />87. All excess soil from the site shall be off-hauled from the site and disposed of in a <br />lawful manner. No temporary stockpiling of dirt on this site shall occur without <br />specific review and approval by the Planning Department. <br />88. The project developer shall obtain all necessary State and Federal agency <br />environmental permits before approval of the final subdivision map or, at the <br />discretion of the City Engineer and Planning Director, the issuance of a grading <br />permit. <br />89. Unless otherwise approved by the City Engineer, the storm drainage from each lot <br />shall be directed to the street or to an approved storm drain system in accordance <br />with Sections 2907(b)(5) and 7012(d) of the 1988 Uniform Building Code. <br />90. Unless otherwise approved by the City Engineer, all fill and cut slopes shall be 3:1 <br />horizontal to vertical or less. <br />91. All existing on-site utility lines and all utilities required to serve the proposed <br />development on-site shall be installed underground in a joint utility trench, unless <br />otherwise determined by the City Engineer. <br />92. The project developer shall comply with the recommendations of the geotechnical <br />report entitled "Geotechnical Investigation on Proposed Residential Development <br />Lot 27, 1630 Vineyard Ave" prepared by Terrasearch, Inc. and any supplemental <br />peer review or response letters. The applicants shall address the peer review <br />comments to the satisfaction of the City Engineer prior to parcel map approval. <br />The project developer's geotechnical consultant shall review and approve all <br />foundation, retaining wall, and drainage geotechnical aspects of the final <br />development plans to ensure that the recommendations have been properly <br />incorporated into the development. The consultant shall certify by writing on the <br />plans or as otherwise acceptable to the Chief Building Official that the final <br />development plan is in conformance with the geotechnical report approved with <br />the project. <br />