My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
93. The project developer shall arrange and pay for the geotechnical consultant to <br />inspect and approve all foundation, retaining, and wall and drainage geotechnical <br />aspects of project construction. The consultant shall be present on site during <br />grading and excavation operations. The results of the inspections and the as-built <br />conditions of the project shall be certified in writing by the geotechnical consultant <br />for conformance to the approved plans and geotechnical report and submitted to <br />the City Engineer and Chief Building Official for review and approval prior to <br />occupancy. <br />94. The project developer shall submit a refundable cash bond for hazard and erosion <br />control prior to issuance of an Engineering or Building Department permit. The <br />amount of this bond will be determined by the City Engineer. <br />95. The project developer/subdivider shall deposit a bond with the City of Pleasanton <br />to ensure completion of any required improvements. This bond shall be in a <br />standard form approved by the City Attorney and shall be in an amount <br />satisfactory to the City Engineer. The City Engineer may waive this requirement <br />if the required improvements have been satisfactorily installed/constructed prior to <br />recordation of the final parcel map. <br />96. The project developer shall grant an easement to the City over those parcels <br />needed for public service easements (P.S.E.) and which are approved by the City <br />Engineer or other easements, which may be designated by the City Engineer. <br />97. The project developer's contractor(s) shall obtain an encroachment permit from the <br />City Engineer prior to moving any construction equipment onto the site. <br />98. The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of an encroachment permit. <br />99. The project developer shall include erosion control measures on the final grading <br />plan, subject to the approval of the City Engineer. The project developer is <br />responsible for ensuring that the contractor is aware of such measures. All cut and <br />fill slopes shall be revegetated and stabilized as soon as possible after completion <br />of grading, in no case later than October 15. No grading shall occur between <br />October 15 and April 15 unless approved erosion control measures are in place, <br />subject to the approval of the Building Department. Such measures shall be <br />maintained until such time as permanent landscaping is in place. <br />100. Storm drainage swales, gutters, inlets, outfalls, and channels not located within the <br />area of a dedicated public street or public service easement approved by the City <br />Engineer shall be privately maintained by the property owners or through an <br />
The URL can be used to link to this page
Your browser does not support the video tag.