My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />Excavations <br />15. Our field investigation has revealed that the Livermore Gravel materials that underlie the <br />majority of the site are generally rippable with conventional equipment (rubber tire backhoe or <br />larger). However, it is noted that localized areas of harder material maybe encountered in some <br />of the hill areas, especially on the estate lot where steeper more resistant terrain is present. The <br />assessment of rippability of the bedrock is difficult to quantify as it depends on many factors <br />including: equipment type, area of operations (mass grading or trench situation), and certain <br />material properties (such as rock strength, rock type, the •nature and frequency of defects, and <br />seismic velocity). An evaluation of rippability of the deep cut will be made when the additional <br />boring is advanced. <br />Materials Usage <br />16. With regard to filling operations, all subsurface materials encountered during our <br />investigation, except those within the top few inches of predominantly organic plant would be <br />suitable for use as engineered fill when placed and compacted at the recommended moisture <br />content. <br />17. Import material is not expected, however, should import material be used. to establish the <br />proper grading for the proposed development, the import material should be approved by the Soil <br />Engineer before it is brought to the site. Import material may be of any type but should not be <br />more expansive than the on-site soil for the foundation recommendations presented below to be <br />applicable. If the import soil is more expansive than expected, then the foundation <br />recommendations presented in this report will change and additional foundation design criteria <br />will need to be provided. <br />TERRASEARCH, inc. Page 15 of 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.