Project No. 9929.G Geotechnical Investigation/Vineyard Avenue, Pleasanton 8 August 2003 <br />Keyway Construction <br />18. Where fills are to be constructed on existing slopes steeper than 6:1 (horizontal to <br />vertical), the surface soils are to be removed and keyways should be provided at the base of the <br />fill and should be a minimum of 15 feet wide, cut into firm natural ground, and sloped back into <br />the hillside at a gradient of no less than 2%. It is estimated that the depth of keyways will be at <br />least 3 feet in depth. Subsequent keyed benches should be placed at vertical intervals no greater <br />than 5 feet and should have a width of no less than 5 feet. The fill embankment could then be <br />constructed by placing engineered fill as specified in the following section. A subsurface drain <br />may need to be constructed at the back base of the key and possibly at additional locations as the <br />filling progresses. The location and quantity of any subdrains will be made as part of final <br />grading plan preparation or in the field by the Soil Engineer during grading. <br />Fill Placement <br />19. All engineered fill should be placed in lifts not exceeding 8 inches in uncompacted <br />thickness and compacted to the following requirements: <br />Condition Minimum Relative Placed Moisture Content <br />Compaction) Above Optimum <br />Base of keyways 95% 2 to 3% <br />General Fill (to within 10 feet <br />95% <br />2to3% <br />of finished design grade) <br />General Fill (upper 10 feet of 90% 2 to 3% <br />design grade) <br />Notes: 1) as determined by ASTM D1557-91 Laboratory Test Procedure <br />2) The 95% compaction is required in order to minimize the potential for excessive <br />total and differential settlement. <br />TERRASEARCH, inG Page 16 of 53 <br />