Laserfiche WebLink
LIVERMORE and PLEASANTON agree to work together to secure Caltrans <br />approval of any additional improvements required for the Caltrans I-580/Fallon <br />Road Interchange Modification Project No. 04-257604. <br />4.2 AUTHORITY agrees to pay for the full -cost to construct the El Charro Road <br />Improvements and the Freisman Road Relocation Improvements. The Freisman <br />Road Relocation Improvements shall be bid as a separate cost item and the <br />improvement costs tracked separately from the El Charro Road Improvements costs. <br />The Freisman Road Relocation Improvements shall be built to LIVERMORE <br />standards. The El Charro Road Improvements shall be built to PLEASANTON <br />standards. <br />4.3 LIVERMORE agrees to cooperate in permitting and implementing the <br />construction of the El Charro Road Improvements and the Freisman Road Relocation <br />Improvements. Livermore shall obtain all necessary rights of way within the City of <br />Livermore for the El Charro Road Improvements and the Freisman Road Relocation <br />Improvements at no cost to the AUTHORITY or PLEASANTON. LIVERMORE <br />further agrees that the Freisman Road Relocation Improvements do not include any <br />underground utilities and are not required to be above the 100-year flood level if paid <br />for by the AUTHORITY. The El Charro Road Improvements shall be built to <br />PLEASANTON standards. <br />4.4 LIVERMORE agrees to fully cooperate in any mitigation requirements by <br />other agencies required for the construction of the El Charro Road Improvements and <br />the Freisman Road Relocation Improvements, including providing AUTHORITY <br />with copies of any mitigation agreements between LIVERMORE and other parties <br />that may impact the El Charro Road Improvements and/or Freisman Road Relocation <br />Improvements. <br />4.5 LIVERMORE shall inspect the Freisman Road Relocation Improvements and <br />shall accept the road improvements in the same fashion as other road projects within <br />LIVERMORE. Any costs of inspection shall be added to the Freisman Road <br />Relocation Improvement construction costs. Following acceptance, maintenance of <br />the Freisman Road Relocation Improvements shall be solely LIVERMORE'S <br />responsibility. <br />4.6 Prior to LIVERMORE'S approval of any Final Map or issuance of any <br />building permit within the El Charro Specific Plan area, or prior to LIVERMORE's <br />constructing any extension of Jack London Boulevard to El Charro Road, <br />LIVERMORE shall pay to the AUTHORITY $2.0 million for the El Charro Road <br />Improvements, plus 100% of the actual cost of the Freisman Road Relocation <br />Improvements for those Improvements shown on Exhibit D, not to exceed <br />$1,120,000, plus any costs of mitigation required by other agencies; provided, <br />however, the $1,120,000 shall be reduced by any costs to LIVERMORE to remove or <br />replace the Freisman Road Relocation Improvements so that they meet LIVERMORE <br />9 <br />Cost Sharing Agreement <br />Surplus Property Authority, Livermore and Pleasanton <br />