Laserfiche WebLink
street standards and are in the proper location and elevation to serve the El Charro <br />Specific Plan development. <br />4.7 If LIVERMORE has not paid AUTHORITY the amounts set forth in <br />paragraph 4.6 within 12 months of the substantial completion of the El Charro Road <br />Improvements and the Freisman Road Relocation Improvements, the total amount <br />due shall accrue interest at the current Local Agency Investment Fund rate until <br />payment is made by LIVERMORE. <br />5. IMPLEMENTATION OF FLOOD PROTECTION IMPROVEMENTS BY <br />AUTHORITY <br />5.1 If LIVERMORE has not succeeded in obtaining the full execution of a <br />CLOMR removing all of the Staples Ranch Property from the 100 year flood zone, <br />settled all legal challenges against the El Charro Specific Plan and/or the El Charro <br />Specific Plan EIR by January 1, 2008, secured all necessary permits and completed <br />construction plans for the Livermore Floor Protection Improvements by April 30, <br />2008 or commenced construction for the Livermore Flood Protection Improvements <br />by July 1, 2008, AUTHORITY shall, at its sole discretion, have the right to decide to <br />pursue a flood control project ("Staples Ranch Flood Protection Alternative") that <br />would not be located within the El Charro Specific Plan Area. The Staples Ranch <br />Flood Protection Alternative would not remove the areas currently designated for <br />commercial development within the El Charro Specific Plan from the 100 year flood <br />zone and would not change the current hydrologic conditions in the El Charro <br />Specific Plan Area.. If the AUTHORITY chooses to pursue the Staples Ranch Flood <br />Protection Alternative. the AUTHORITY shall design, permit and construct such <br />project. LIVERMORE shall cooperate with the AUTHORITY in the <br />AUTHORITY'S efforts to obtain all necessary permits and approvals for the Staples <br />Ranch Flood Protection Alternative, but LIVERMORE shall have no obligation to <br />contribute funding to the Staples Ranch Flood Protection Alternative. <br />5.2 If LIVERMORE, for any reason, fails to commence construction of the <br />Livermore Flood Protection Improvements by July 1, 2008, (or a later date if <br />LIVERMORE and AUTHORITY mutually agree) the AUTHORITY shall have the <br />right to proceed with the design, permitting and construction of the Livermore Flood <br />Protection Improvements. If the AUTHORITY makes this election, LIVERMORE <br />shall cooperate with AUTHORITY, including, but not limited to, providing <br />AUTHORITY with all studies, drawings, permits, agreements, permit applications <br />and draft agreements relating to the design, permitting and construction of the <br />Livermore Flood Protection Improvements. LIVERMORE shall also cooperate, to <br />the fullest extent possible, in permitting the AUTHORITY to construct the Livermore <br />Flood Protection Improvements by providing AUTHORITY with all necessary <br />10 <br />Cost Sharing Agreement <br />Surplus Property Authority, Livermore and Pleasanton <br />