Laserfiche WebLink
permits under the control of LIVERMORE, including, but not limited to, the use of <br />LIVERMORE owned property (including lease payment, if any, and maintenance <br />costs), encroachment permits and grading permits. At the time AUTHORITY <br />deems it necessary to proceed with the Livermore Flood Protection Improvements, <br />the parties agree to meet and confer to mutually agree upon a new completion <br />schedule based on the AUTHORITY's and LIVERMORE's schedules for <br />development in their respective Specific Plan areas (El Charro and Staples Ranch). <br />5.3 If AUTHORITY takes over the construction of the Livermore Flood <br />Protection Improvements pursuant to Paragraph 5.2, above, the AUTHORITY shall <br />seek to obtain a Reimbursement Agreement with Zone 7 for the Livermore Flood <br />Protection Improvements. If Zone 7 (a) fails to enter into a Reimbursement <br />Agreement with the AUTHORITY that is satisfactory to the AUTHORITY, (b) <br />requires that the Livermore Flood Protection Improvements be part of a larger flood <br />control project that would cost more than a total of $7 million, or (c) does not agree to <br />reimburse AUTHORITY for all costs associated with the Livermore Flood Protection <br />Improvements, with the exception of no more than a total of $2 million in non- <br />reimbursable costs, LIVERMORE and AUTHORITY agree as follows: <br />AUTHORITY shall have the right to design, permit and construct a "Minimum <br />Livermore Flood Protection Improvements" project on LIVERMORE property within <br />the El Charro Specific Plan Area that will include only those elements necessary to <br />(1) remove all of the Staples Ranch Property and that portion of the El Charro <br />Specific Plan area designated for commercial development from the 100-year flood <br />zone, and (2) mitigate for any associated impacts provided that there are no new <br />negative impacts to LIVERMORE. A conceptual "Minimum Livermore Flood <br />Protection Improvements" is illustrated in Exhibit F and is currently assumed to <br />consist solely of a North Overbank Area and a South Bank Detention Basin, located <br />to the west of the existing golf course on property owned by LIVERMORE. <br />5.4 If the AUTHORITY, pursuant to Paragraph 5.3, above, designs and <br />constructs the "Minimum Livermore Flood Protection Improvements "project, <br />LIVERMORE shall cooperate with AUTHORITY, including, but not limited to <br />providing AUTHORITY with all studies, drawings, permits, agreements, permit <br />applications and draft agreements relating to the design, permitting and construction <br />of a "Minimum Livermore Flood Protection Improvements "project. LIVERMORE <br />shall also cooperate, to the fullest extent possible, in permitting the AUTHORITY to <br />construct the "Minimum Livermore Flood Protection Improvements" project by <br />providing AUTHORITY with all necessary permits under the control of <br />LIVERMORE, including, but not limited to, the use of LIVERMORE owned <br />property ,encroachment permits and grading permits. LIVERMORE agrees to <br />permit AUTHORITY to stockpile any excess excavation material generated by the <br />"Minimum Livermore Flood Protection Improvements" project as close to the areas <br />of work as practical that will not conflict with flood protection, that are acceptable to <br />any affected agencies and any affected land owners and is consistent to the El Charro <br />Specific Plan Improvements. The parties agree to negotiate the placement of the <br />11 <br />Cost Sharing Agreement <br />Surplus Property Authority, Livermore and Pleasanton <br />