My WebLink
|
Help
|
About
|
Sign Out
RES 86171
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2012 4:33:50 PM
Creation date
12/14/1999 11:07:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/15/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ iJ <br /> <br />V. INSPECTION <br /> <br /> A. All onsite construction shall be inspected and approved <br /> by the City of Pleasanton. <br /> <br /> B. A pre-construction conference may be required, by the <br /> City of Pleasanton, prior to the start of construction. <br /> <br /> C. Inspection by the City of Pleasanton of onsite work may <br /> include, but is not limited to, the following items of work: <br /> <br /> 1. Site gradinq and paving. <br /> <br /> The City Inspector will check to see that grading and <br /> paving is done to the approval of the Soils Engineer <br /> and in a competent manner. Compaction and sample tests <br /> are the responsibility of the owner or his Soils <br /> Engineer. <br /> <br /> 2. Underqround Utilities <br /> <br /> The City Inspector will check to see that utilities are <br /> of the sizes indicated on plans. Material and <br /> installation procedures must bedone according to the <br /> requirements of applicable codes. Final grades and <br /> locations of the utilities and depth of cover must be <br /> in compliance with manufacturer's specifications. All <br /> of the above will be the responsibility of the <br /> Contractor. <br /> <br /> Where utilities are gravity flow lines, the City <br /> Inspector will check for minimum slopes of flow lines, <br /> as specified in the applicable code for that particular <br /> size and type of pipe. As noted in Section D, page 14 <br /> of these guidelines, cut sheets must be provided to the <br /> inspector for sanitary sewer pipe to be installed at <br /> slopes less than the minimums specified in the UPC for <br /> the particular pipe size, or when installed at a slope <br /> of 1% or flatter. <br /> <br /> The inspector will check to see that trench backfill is <br /> of the type specified and is placed to the approval of <br /> the Soils Engineer, or if not specified by the Soils <br /> Engineer, meets the requirements of Section 13 Trench <br /> Backfill of the City Standard Specifications. <br /> <br /> Utilities which are to be publicly owned and maintained <br /> will be checked for conformance to the requirements of <br /> the City Standard Details and Specifications. This <br /> includes pipe material, trenches, trench backfill, <br /> <br /> 25 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.