Laserfiche WebLink
The proposed location of the electrical transformer, if above <br />ground, must be approved by the City of Pleasanton Planning <br />Department. The transformer must be located behind the imaginary <br />extension of the building facade, as a minimum. <br /> <br />K. Asphalt Paving: Asphalt concrete paving shall be installed <br />onsite in conformance with the requirements of the City of <br />Pleasanton Standard Specifications, Sections 4 through 11, City <br />of Pleasanton Design Guidelines 1984 Section 4 and to the <br />approval of the Soils Engineer. <br /> <br />Unless specifically eliminated on the plans, all asphalt concrete <br />paving shall receive prime and seal coats. <br /> <br />L. Utility Trench Backfill: Onsite trench backfill must be of <br />the type and must be installed in accordance with that <br />recommended in the Soils Investigation. If specific <br />recommendations are not made in the Soils Investigation for <br />trench backfill, or if the Contractor does not want to comply <br />with such recommendations, the trench backfill must meet the <br />requirements of and be placed in accordance with Section 13 of <br />the City of Pleasanton Standard Specifications. In either case, <br />trenching and trench backfill must meet with the approval of the <br />City Engineer. <br /> <br />It is the responsibility of the Contractor to comply with all <br />requirements of OSHA regarding trench excavation, bracing, <br />shoring, etc. <br /> <br /> 24 <br /> <br /> <br />