My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
061708
>
18 ATTACHMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:05:34 PM
Creation date
6/17/2008 4:37:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/17/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
123 MAIN STREET EXPANSION AND INTERIOR UPGRADES – DESIGN ONLY <br />PROJECT DESCRIPTION: <br /> This project provides design costs to expand and upgrade <br />carpeting and other needed interior improvements. Total project costs and funding will be <br />determined following project evaluation and design. <br />PROJECT JUSTIFICATION: <br /> This project will evaluate and design a minor expansion to <br />maximize available civic center facilities. The project will also look as modification to the <br />front entry doors for improved ADA accessibility. The proposed additional space will be <br />used for offices. The facility improvements are needed to address facility wear and tear. <br />PROJECT COST ESTIMATE <br />ItemCostFundingSource <br />Project Design Costs $20,000Miscellaneous General Fund CIP $20,000 <br />CIP #:CATEGORY: RECOMMENDATION: <br />088037 Misc. Fund in 2008-2009 <br />SENIOR CENTER – INSTALL NEW ROOF – DESIGN ONLY <br />PROJECT DESCRIPTION: <br /> This project provides design costs to remove the existing <br />deteriorated roof and replace it with a new roof. Total project costs and funding will be <br />determined following project evaluation and design. Staff assumes using similar designed <br />shingles for the replacement. <br />PROJECT JUSTIFICATION: <br /> The current roof is badly damaged and needs to be replaced. <br />The current roof condition has resulted in numerous and frequent leaks which may damage <br />the building’s interior and lead to safety risks. The design work includes roof evaluation and <br />preparation of installation specification. <br />PROJECT COST ESTIMATE <br />ItemCostFundingSource <br />Project Design Cost $20,000Miscellaneous General Fund CIP $20,000 <br />CIP #:CATEGORY: RECOMMENDATION: <br />088036 Misc. Fund in 2008-2009 <br />êë <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.