Laserfiche WebLink
The schedule and fee for successful completion of a project varies by the number of study intersections, the <br />number of analysis scenarios, the level of analysis required (i.e. Synchro HCM based calculations or micro- <br />simulation) and the intended final use of a document such as a negative declaration, mitigated negative <br />declaration, or an Environmental Impact Report. <br />As requested, we have provided a preliminary schedule and fee estimate for completion of a stand alone <br />transportation impact study for ten intersections and a transportation impact study for inclusion in an <br />Environmental Impact Report with up to 25 study intersections. As schedule can be dictated by receipt of <br />information from third parties, we have also included our proposed schedule of deliverables based on receipt of <br />information from the City or other parties. The fee estimate includes two meetings for a standalone study and four <br />meetings for a larger project. Site plan review, parking evaluation, and CMA analysis would be included in both <br />study types. <br /> Standalone Study Environmental <br />Task/Submittal Anticipated SubmittaVDependenctes (t0 intersectlons) Impact Report <br /> 25 Intersections <br />Technical memorandum Receipt of a fully executed contract, <br />summarizing project trip final project description, and select <br />generation and distribution zone analysis for each land use Two weeks Two weeks <br />assumptions for City proposed within the site for the <br />.review and approval project. <br />Technical memorandum Receipt of City approval of the <br />summarizing traffic previous technical memorandums, Three to four <br />forecasts for City review and final link- and intersection- level weeks Six weeks <br />and approval forecasts (.dbf turns file and loaded <br /> network plots). <br /> Receipt of City approval of the <br />Draft Transportation Study technical memorandum Two to three weeks Four weeks <br /> summarizing the traffic forecasts. <br /> Receipt of comments on the Draft <br />Final Transportation Study Transportation Study, provided no One week Two weeks <br /> additional analysis is requested. <br />Responses to Comments Receipt of the applicable comments <br />on EIR (assuming a reasonable number of N/A Two weeks <br /> transportation related comments) <br />Time Range Eight to Ten Weeks Fourteen weeks <br />Estimated Fee Range $20,000 to $35,000 $60,000 to $90,000 <br />s <br />