Laserfiche WebLink
Fehr & Peers prepared traffic calming guidelines <br />for the City of Stockton. Work products included a <br />Neighborhood Traffic Management Program <br />document, development of a website to facilitate <br />public outreach, and a training manual to assist <br />staff in implementing traffic calming plans and <br />design standards for new residential streets. Fehr <br />& Peers neighborhood traffic management program <br />for the City of Stockton included preparation of <br />three documents: <br />• Traffic Calming Guidelines that established <br />a process for neighborhoods to request <br />traffic calming measures and a toolbox of <br />acceptable traffic calming measures. <br />• Street Design Standards that replaced the <br />City's previous standards with narrower street width requirements that included additional design <br />elements such as landscape strips, roundabouts, and traffic circles. <br />• Pedestrian Safety and Crosswalk Installation Guidelines, focusing on the installation of marked <br />crosswalks at controlled and uncontrolled locations. <br />Pleasant Hill BART Transit Village (Pleasant Hill) <br />Fehr & Peers assisted during the charrette process and provided transportation planning and traffic engineering <br />design services for the final plan of the Pleasant Hill BART Transit Village in Contra Costa County. BART and the <br />County Redevelopment Agency worked with a developer to provide gland-use plan for development on the BART <br />property, including the surtace parking lot. <br />The land-use plan resulting from the charrette process and refined in the final plan includes residential, office, and <br />retail uses. The existing parking garage will be enlarged to replace spaces on the surtace lot. Fehr & Peers <br />worked with the architects and designers by evaluating the many iterations of the plan regarding parking, site <br />access, and circulation (for vehicles, pedestrians, and bicyclists) and reviewing previous traffic studies for <br />roadways in the area. <br />Fehr & Peers then worked with the County, transit agencies, and developer team to refine the transportation <br />system serving the site including truck, bus, and emergency vehicle turning analysis, parking layout, transit stop <br />design, road and parking layouts, and plans specifications and estimates for traffic signal modifications. <br />Pittsburg Local Traffic Mitigation Fee Update <br />Fehr & Peers assisted the City of Pittsburg to complete a major update of the City's local traffic impact fee <br />program. The program update involved establishing a list of capital improvement projects, preparing cost <br />estimates for the projects, identifying existing deficiencies, and establishing a nexus between local growth and <br />new traffic demands. Fehr & Peers ran the regional travel model to estimate the amount of non-local traffic using <br />city streets and deducted the proportional cost from the fee program. In addition, the updated program had to be <br />set up to be complementary with the East Contra Costa regional traffic impact fee program. -There were several <br />meetings with the City Council to discuss fee program options and an updated program was eventually adopted. <br />Stockton Traffic Calming (Stockton) <br />