Laserfiche WebLink
the Memorandum are the land plans that are in place for projects that have already been approved or that <br />have proposed modifications to those plans, including the Stoneridge Drive Specific Plan, the <br />modification proposed for the Stoneridge Drive Specific Plan, the Lauer PUD, the Jennaro PUD, and <br />various other projects. <br />In response to a question by Commissioner Wright, Mr. Swift stated that one role of the Planning <br />Commission is to make a recommendation whether any of the projects that have already been approved <br />should be re-evaluated. He noted that there are some legal constraints, in that a project must first reach <br />a certain stage in its development before it's considered a vested project. Once it has reached that point, <br />there is nothing the City can do to prevent its completion in accordance with the approval. He noted <br />that, at this time, the only approved project that has reached that point is the Standard Pacific Phase III. <br />However, they have submitted a modification to their PUD which will not be covered by the old <br />tentative map. Therefore, they aze taking the risk of subjecting the project to re-review. <br />Mr. Swift also reported that some azeas, including the Stoneridge Drive Specific Plan, have received a <br />lot of study, but most of the area that is not developed is not vested. Therefore, the City can amend the <br />General Plan, the Specific Plan, the street circulation system, and the land uses. <br />In response to firrther questioning by Chair Cooper, Mr. Swift stated that the Commission could <br />recommend no additional review, a very limited review, or a review of any and all projects that do not <br />have vested development rights. <br />Commissioner Kumazan asked Mr. Swift to describe the perimeter of what is being discussed. He <br />- responded that it is the Planning Commission's decision to decide where that boundary should be. He <br />noted that the boundary that was mentioned at the City Council meeting by the residents who presented <br />the petition, recommending a boundary with Interstate 580 on the north, Santa Rita Road on the west, <br />Stanley Boulevard on the south, and the end of the City of Pleasanton planning area on the east. <br />Mr. Swift stated that a staff report will be presented at the next public hearing which identifies various <br />options and alternatives. <br />PUBLIC HEARING WAS OPENED <br />Larry Appleton, Kaiser Sand and Gravel, P.O. Box 580, Pleasanton, presented a letter to the <br />Commission pointing out that because there is no staff report identifying the issues, he is challenging all <br />of them. He feels that the General Plan should not be changed, but does not think it matters to change <br />the Specific Plans. He further stated that all stakeholders should be involved in the plan. He is interested <br />in being involved in any study group for this project. However, he stated that he is opposed to any <br />additional study. He also stated that if a specific plan study is done then there must be an EIR, and he <br />feazs that it will probably conflict with other specific plan EIR's. In summary, he stated that he is in <br />support of the original 1989 Stoneridge Specific Plan. <br />Victoria Holt, 3390 Vermont Place, stated that she has been involved with the Staples Ranch/Ponderosa <br />Coalition since 1988. She noted that when she purchased her home ten years ago, she understood what <br />was planned for the area under the 1989 general plan and specific plan, and is angry that a developer can <br />later purchase the land and thereby take away the general and specific plans. In addition, she feels that <br />Planning Commission Page 17 February 25, 1998 <br />