Laserfiche WebLink
7f. Berming or other sound attenuation shall be incorporated into the landscape plan in an <br />addition to a design that minimizes the impact to the homes on Bowen Street. In addition, the <br />number of boxed sized trees shall be approved by the Planning Director. <br />72. Delete "existing" so that the condition applies only to the new dumpster. <br />55. Delete the first sentence on this condition. Amend the second sentence to add the word <br />"gate" after "The" at the beginning of the sentence. <br />ROLL CALL VOTE <br />AYES: Commissioners Bazker, Dove, Kumazan, Wright, and Chair Cooper <br />NOES: None <br />ABSENT: None <br />ABSTAIN: None <br />Resolution No. PC-98-12 was entered and adopted as motioned. <br />RECESS TAKEN AT 9:55 P.M. <br />RECONVENED AT 10:05 P.M. <br />e. Consideration of the scone and process for a proposed saecific plan for the eastern aortion <br />- of the City of Pleasanton <br />Chair Cooper noted for the record that the staff report for this item has not yet been completed. <br />However, since so many public notices were sent out, it was decided to proceed with the public heazing. <br />He stated that a special meeting will be scheduled specifically for this issue and all residents will <br />received a notice. <br />Brian Swift, Planning Director, stated that after the Ponderosa project on the Busch property was <br />originally approved by the City Council, it was referended by the requisite number of signatures <br />collected. The City Council then decided to rescind their approval, rather than put the issue on the ballot. <br />At the same time, they requested that the Planning Commission determine a proposed study for the east <br />side of Pleasanton. They specifically asked the Planning Commission to determine whether such a study <br />should take place, what its purpose should be, the scope of the study, the azea of the study, and the <br />process for conducting the study. Mr. Swift also described the vazious types of studies that could be <br />done and stated that any of them would have to be consistent with and conform to the General Plan or <br />propose changes to the General Plan. He noted that staff will prepaze a report and give <br />recommendations after hearing the public's input and the Commission's recommendation. <br />In addition, Mr. Swift noted his February 25, 1998, Memorandum describes the action taken by the City <br />Council and what they have requested from the Planning Commission. He also stated that the issues <br />staff would like to have addressed by the public and by the Commission aze identified in the <br />Memorandum. He also pointed out that one of the issues to be determined is whether the boundary line <br />stops at Stanley Boulevard to the south or whether it should go even further than that. Also attached to <br />Planning Commission Page 16 February 25, 1998 <br />