My WebLink
|
Help
|
About
|
Sign Out
CONGESTION MANAGEMENT AGENCY - INTERSTATE 580 HOV MOU LANDSCAPE
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
ALAMEDA COUNTY
>
CONGESTION MANAGEMENT AGENCY - INTERSTATE 580 HOV MOU LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 2:29:11 PM
Creation date
10/13/2008 12:03:20 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/27/2008
LONG TERM AGREEMENTS - NAME
CONGESTION MANAGEMENT AGENCY
LONG TERM AGREEMENTS - TYPE
MOU AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-05
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
I580 HOV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. To assist the Local Agencies in meeting environmental clearance <br />requirements for landscape replacement work performed outside of Caltraus right-of- <br />way. <br />5. To monitor the work progress of the Landscape ReplacemenC Project <br />performed by the Local Agencies. <br />Article III: Livermore agrees: <br />1. To be Che lead agency with respect to NEPA and CEQA requirements for <br />all landscape replacement work implemented within Livermore. <br />2. To implement landscape replacements at the vineyard buffer along the I- <br />580 corridor per the EI Charro Specific Plan and the Southeast quadrant of the Fallon/El <br />Charro Road interchange, or other mutually-approved location(s). <br />3. To provide environmental clearance documents, design package, and <br />engineer's estimate for all landscape replacement within Livermore. <br />4. To submit valid invoices for all landscape replacement work withi^ <br />Livermore to ACCMA for reimbursement, up to the limit of funding available to <br />Livermore. <br />5. To provide an alternate location if installation of the vineyard buffer <br />required by Che EI Charro Specific Plan would not meet the deadline described in the EB <br />HOV Neg. Dec. The requirement is Chat all the replacement plantings shall be <br />implemented within two years of the completion of all roadwork of the I-580 EB HOV <br />lane. <br />Article IV: Dublin agrees: <br />1. To be the lead agency with respect to NEPA and CEQA requirements for <br />all landscape replacement work implemented within Dublin. <br />2. To implement landscape replacements at Che North side of Che Fallon/EI <br />Ch~u'ro Road Interchange. <br />3. To provide the environmental clearance documents, design package, and <br />engineer's estimate for all landscape replacement within Dublin. <br />4. To submit valid invoices for al] landscape replacement work within <br />Dublin to ACCMA fot' reimbursement, up to the limit of funding available to Dublin. <br />Article V: Pleasanton agrees: <br />1. To be the lead agency with respect to NEPA and CEQA requirements for <br />all landscape replacement work implemented within Pleasanton. <br />March 27, 2008 <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.